My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-01-14_REPORT - M2007044
DRMS
>
Day Forward
>
Report
>
Minerals
>
M2007044
>
2010-01-14_REPORT - M2007044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:58:36 PM
Creation date
1/21/2010 9:43:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007044
IBM Index Class Name
REPORT
Doc Date
1/14/2010
Doc Name
Fourth quarter 2009 Hydrological Report
From
Energy Fuels Resources
To
DRMS
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
significantly lower at 1.5 gallons per minute (gpm), down from an average of 4.5 gpm. <br />The cause of the lower observed flow rates at PR Spring is not known. The field <br />parameters at PR Spring were generally consistent with previous measurements the <br />exception of slightly elevated pH and dissolved oxygen levels. The elevated pH and <br />dissolved oxygen levels may be due to low temperature of the spring water. Previous and <br />current flow rates and field parameters at DP Spring and PR Spring are summarized in <br />Sections 4 and 5 of the Hydrological Report. Analytical data from previously collected <br />samples from PR Spring are summarized in Table 2. <br />Monitoring Well W-1 <br />Monitoring Well W-1 was installed on October 12, 2008 for the purpose of characterizing <br />and monitoring groundwater quality downgradient of the waste rock dump. During the <br />quarter, Monitoring Well W-1 was sampled once on December 10, 2009. Previous and <br />current water levels and field parameters are summarized in Section 6 of the Hydrological <br />Report and the analytical data from Monitoring Well W-1 is summarized in Table 3. The <br />analytical data report for the collected sample is included in Appendix A of the report. <br />The water level, field parameters and analytical data from Monitoring Well W-1 was <br />similar in chemistry and water quality to previous sampling events. <br />The most recent sampling event was the seventh of eight required events to establish <br />baseline conditions. Following the final baseline sample collection in the First Quarter of <br />2010, the water level at Monitoring Well W-1 will be measured quarterly and samples <br />will be collected annually to detect changes in water quality. <br />Lumsden Canyon Seen <br />The Lumsden Canyon Seep (also referred to in earlier reports as Lumsden Canyon <br />Spring) was monitored for field parameters and sampled in June and December of 2008. <br />This location was monitored by Western Water & Land, Inc. during hydrologic <br />reconnaissance required by BLM stipulations to the mine permit. The field parameters <br />measured are summarized in Section 7 of the Hydrological Report while the analytical <br />data from the Lumsden Canyon Seep samples is summarized in Table 4. <br />Rajah 49 Thornton Portal <br />Water was first observed flowing from the Rajah 49 Thornton Portal and sampled in the <br />Third Quarter of 2009. The estimated flow rate and measured field parameters are <br />included in Section 8 of the Hydrological Report and the analytical data is summarized in <br />Table 5. Energy Fuels will continue to include the Thornton Portal in future annual seep <br />surveys and collect samples for analysis if discharge is observed. <br />' Waste Rock <br />Production rates of ore and waste rock are shown in Sections 9 and 10 of the <br />Hydrological Report, respectively. No ore was mined and no waste rock was produced in <br />the Fourth Quarter of 2009. Because the Whirlwind Mine is currently on stand-by status <br />with only maintenance activities being conducted, Energy Fuels will be suspending the <br />' quarterly waste rock sample collection until such time that mining operations resume and <br />waste rock removal from the mine commences. <br />
The URL can be used to link to this page
Your browser does not support the video tag.