My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-01-11_PERMIT FILE - M2009078
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2009078
>
2010-01-11_PERMIT FILE - M2009078
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:58:29 PM
Creation date
1/21/2010 9:34:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009078
IBM Index Class Name
PERMIT FILE
Doc Date
1/11/2010
Doc Name
Reclamation Liability Estamate
From
DRMS
To
Greg Lewicki and Associates
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER RIPPING WORK <br />PROJECT IDENTIFICATION <br />Task # : 03a <br />Date : 01/11/2010 <br />User : GRM <br />State :Colorado <br />County :Moffat <br />Site : Lehrman Pit <br />Utilization <br />% <br />E <br />Cost Breakdown : Ownership cost/hour : $53.54 NA <br />100 <br />Dozer operating cost/hour : $70.36 <br />Ripper operating cost/hour : $6.29 100 <br />Operator cost/hour : $38.54 NA <br />Total unit cost/hour : $168.72 Total fleet cost/hour : $168.72 <br />MATERIAL QUANTITIES <br />Selected estimating method : Area <br />Alternate methods - <br />Seismic : NA NA <br />Area : 5.00 <br />acres <br />Unadjusted production <br />per selected method <br />Site altitude <br />Altitude adjustment <br />Job efficiency factor <br />Net job correction <br />Source of estimated quantity: Exhibit E and L - <br />Source of estimated load factor : NA? <br />HOURLY PRODUCTION <br />Alternate methods - <br />Seismic : Seismic velocity <br />Unadjusted production <br />Area : Avg. ripping depth <br />Average ripping width <br />Average ripping length <br />Average dozer speed <br />Average maneuver time <br />Production per unit area <br />Blade type : Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br />Data source : (CRG) <br />Load factor : NA Bank volume <br />Rip depth (ft) : 2.00 Volume <br />NA feet/second <br />NA cu. yds./hour <br />1.00 feet/pass <br />7.08 feet/pass <br />100.00 feet/pass <br />88.00 feet/minute <br />0.25 minutes/pass <br />6.703 acres/hour <br />Unadjusted production : 1,134.86 cu. yds./hour <br />JOB TIME AND COST <br />Fleet size : 1 dozer(s) <br />Permit/job # :M-2009-078 <br />Abbreviation :none <br />Filename :M078-03a <br />Total job time : 17.13 hours <br />Unit cost : $0.179 per cu. yd. Total job cost : $2,890 <br />NA BOY <br />16,133 BOY or COY <br />1,134.86 cu. yds./hour <br />6,200 feet <br />1.00 (Cat HB) _ <br />0.83 (1 shift/day) <br />0.83 multiplier <br />Adjusted unit production : 941.94 cu. yds./hour <br />Adjusted fleet production : 941.94 cu. yds./hour
The URL can be used to link to this page
Your browser does not support the video tag.