Laserfiche WebLink
sheet 2 of 2 <br />ROADABLE hUUirMtrv i <br />Machine <br />Description <br />Total <br /> <br />Costihour/unit <br />Fleet Size <br /> <br />(No. units) <br />Haul Trip <br /> <br />Cost/hr/fleet <br />51 <br />$48 <br />Return Trip <br /> <br />Cost/hr/fleet <br />51 <br />$48 <br />-Flatbed Truck, 42, 15K GVW <br />314 T. <br />44 <br />Picku <br />ht Dut <br />Li $48.51 <br />$32.61 1 <br />1 . <br />$32.61 . <br />$32.61 <br />, <br />p, <br />y <br />g <br />- 91 <br />$187 91 <br />$187 <br />-Centrifugal pump - 200M, 10 in. $93.95 2 . . <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $269.02 $269.02 <br />EQUIPMENT HAUL DISTANCE and TIME <br />t 'or city or town within project area region : Craig <br /> Neares m ad Total one-way travel distance : 1.0 miles <br />Transportation Cycle Time : Non- 0 mph <br />40 <br /> Average travel speed : . <br /> Roadable Roadable <br /> Equipment Equipment <br /> <br />1 <br />Haul time (hours) = <br /> <br />0.03 <br /> <br />0.03 <br /> <br />Total non-roadable mob/demob cost <br /> <br />$1,569.60 <br />Return time (hours) = 0.03 0.03 " two round trips with haul rig <br />Loading time (hours) = 0.50 NA Total roadable mob/demob cost ** : $13.45 <br />Unloading time (hours) = 0.50 NA •• one round trip, no haul rig <br />Subtotals = 1.05 0.05 <br /> <br /> Total job time : 2.10 hours <br />JOB TIME AND COST - <br />Total job cost : <br />$1,583