Laserfiche WebLink
STABILITY ANALYSIS: See Ground proposal. (Attached). <br />6.4.6 RECLAMATION PLAN: (F) See attached. <br />6.4.7 WATER INFORMATION: During the processes water will be discharged to the <br />Henderson Ski Lake and the Platte River. We do not expect to, impact the local water table, <br />as long as we are pumping to the ski lake and with the elevation of the water table there <br />appear to have little impact on the static water level. There could be one exception during <br />the final material removal and lining at the SW area of the lake, this should be short term and <br />occur during the months of Nov. and Dec. <br />6.4.8 WILD LIFE INFORMATION: (H) See attached. <br />6.4.9 SOILS INFORMATION: (I) See attached. <br />6.4. 10 VEGETATION INFORMATION: There is no vegetation on site as the site is an <br />active mine. <br />6.4.11 CLIMATE: (K) See attached. <br />6.4.12 RECLAMATION COSTS: (L) See attached. <br />6.4.13 OTHER PERMITS AND LICENSES: (M) See attached. <br />6.4.15 OWNERS OF RECORD. (O) The owners of the surface area also own the gravel. <br />See attached. GSLBrush of ILL. is doing business as 120'h Partners. <br />6.4.17 PROOF OF MAILINGS (Q) See Attached. <br />6.4.18 PROOF OF FILING WITH CLERK AND RECORDER. ® See Attached. <br />6.5. GEOTECHNICAL STABILITY EXHIBIT. (T) See Attached. We plan to use GROUND <br />ENGINEERING as the testing agency during the placement of the liner. <br />OTHER„ MAILING LISTS. (U) ATTACHED.