Laserfiche WebLink
<br />UNITED STATES LIME & MINERALS, INC. <br />COLORADO LIME CO. <br />1468 HIGHWAY 50 <br />DELTA, CO 81416 <br />(970) 874-8300 <br />January 12, 2010 <br />2009 MONARCH QUARRY TONNAGE <br />PERMIT NO. M-2000-098 <br />Rock to Salida Plant <br />Rock to Delta Plant <br />Pit run <br />Screened rock <br />Aglime from stockpile <br />Total <br />7757 tons <br />28,415 tons <br />1267 tons <br />0 tons <br />244 tons <br />37,683 tons <br />Activity at the mine in 2009 began in early January 2009 and continued through the end of the year. No <br />limestone or dolomitic limestone was mined in 2009 and no mining is planned for 2010. Removal of waste <br />dump material was the only reclamation done in 2009 and is the only reclamation planned for 2010. We <br />anticipate the removal of 40-60k tons of material in 2010. The proposed areas for removal are noted on the <br />attached map.