Laserfiche WebLink
U. S. DEPT. OF THE INTERIOR <br /> OFFICE OF SURFACE MINING <br /> Mine Site Evaluation State Program <br /> Permittee/ BEAR COAL COMPANY Permit Number C-1981-033 Field Visit 11/03(2009 Continuation Page <br /> Person <br /> 28. Performance Standard Categories <br /> Codes: 1=Compliance,2=Noncompliance,3=Not Planned,4=Not Started,S=Noncompliance Identified Elsewhere,6=Previously Cited <br /> A. Administrative D. Backfilling&Grading H. _Subsidence Control Plan <br /> 1._Mining within Valid Permit I. Exposed Openings I. Roads <br /> 2._Mining within Bonded Area 2, 1 Contemporaneous Reclamation I. Road Construction <br /> 3._Terms&Conditions of Permit 3. 1 Approximate Original Contour 2, Certification <br /> 4._Liability Insurance 4._Highwall Elimination 3• 1 Drainage <br /> 5._Ownership and Control 5. 1 Steep Slopes(includes downslope) 4. Surfacing and Maintenance <br /> 6._Temporary Cessation 6. Handling of Acid&Toxic Materials 5• 1 Reclamation <br /> 7._AML Rec.Fees--Non-Respondent 7, 1 Stabilization(rills and gullies) J. Signs&Markers <br /> 8._AML Rec.Fees--Failure to Pay E. Excess Spoil Disposal 1. 1 Signs <br /> B. Hydrologic Balance 1._Placement 2. Markers <br /> 1. 1 Drainage Control 2._Drainage Control K. _Distance Prohibitions <br /> 2. Inspections&Certifications 3._Surface Stabilization L. Revegetation <br /> 3. 1 Siltation Structures 4._Inspections&Certifications I, 1 Vegetative Cover <br /> 4. Discharge Structures F. Coal Mine Waste 2. 1 Timing <br /> 5. Diversions (Refuse Piles/Impoundments) M. Postmining Land Use <br /> 6.- <br /> Effluent Limits 1._Drainage Control <br /> 7. Ground Water Monitoring 2._Surface Stabilization N. Other <br /> 8._Surface Water Monitoring 3._Placement General <br /> 9. Drainage--Acid-Toxic Materials 4._Inspections and Certifications Performance <br /> 10. 1 Impoundments 5._Impounding Structures Catagory <br /> I I._Stream Buffer Zones G. Use Of Explosives D 1 1)Phase 2 bond release <br /> C. Topsoil&Subsoil 1._Blaster Certification - - <br /> 1. 1 Removal I Distance Prohibitions _ -2) <br /> 2._Substitute Materials 3._Blast Survey/Schedule <br /> 3. Storage and Protection 4.- <br /> Warnings&Records _ -3) <br /> 4. 1 Redistribution 5._Control of Adverse Effects <br /> Performance Standard Catagories E. Excess Spoil Disposal...........................................(816/817.71-74) <br /> 30 CFR Counterpart 1. Placement........................................................................................... 1(e) <br /> A. Administrative............................................................... .. 2. Drainage Control................................................................................ <br /> 1. Valid Permit.....................................................................................773.11 3. Surface Stabilization...........................................................................71(g <br /> 4. Inspections&Certifications...............................................................71(h) <br /> 2. Mining within Bonded Area................................................773.1] p <br /> 3. Terms&Conditions of Permit.............................................773.17 F. Coal Mine Waste(Refuse Piles/Impoundments) .....(816/817.81-84) <br /> 4. Liability Insurance................................................................800.60 I Drainage Control...............................................................................83(a) <br /> 5. Ownership and Control........................................................778.13 <br /> 6. Temporary Cessation..............................842.11(e)&816/817.131 2. Surface Stabilization..........................................................................83(b) <br /> 7. AML Rec.Fees--Non-Respondant................................870.15(b) 3. Placement...........................................................................................83(c) <br /> 8. AML Rec.Fees--Failure to Pay.....................................870.15(a) 4. Inspections and Certifications...........................................................83(d) <br /> B. Hydrologic Balance......................................(816/817.41-57) <br /> 5. Impounding Structures...........................................................................84 <br /> G. Use of Explosives..................................................(816/817.61-68) <br /> 1. Drainage Control.........................................................................45 l. Blaster Certification...........................................................................61(c) <br /> 2. Inspections&Certifications.............................................49(a)(10) 2 Distance Prohibitions.........................................................................61(d) <br /> 3. Siltation Structures......................................................................46 <br /> 4. Discharge Structures...................................................................47 3. Blast Survey/Schedule....................................................................6 6&6 <br /> 5. Diversions...................................................................................43 4. Warnings&Records...................................................................... 6& 8 <br /> 42 5. Control of Adverse Effects.....................................................................67 <br /> 6. Effluent Limits.......................................................................... <br /> 7. Ground Water Monitoring......................................................41(c) H. Subsidence Control Plan......................................... 817.121-122 <br /> S. Surface Water Monitoring......................................................41(e) I' Roads.................................................................(816/817.150-151) <br /> 9. Drainage--Acid-Toxic Materials...........................................41(f) <br /> 10. Impoundments.......................... ............................................. ..49 1. Road Construction...........................................................................150(c) <br /> 1 1. Stream Buffer Zones...................................................................57 2. Certification......................................................................................151(a) <br /> 3. Drainage...............................................................................150(b)-151(d) <br /> C. Topsoil&Subsoil...............................................(816/817.22) 4. Surfacing and Maintenance..................................................150(e):15 <br /> 1. Removal......... . 1(d) <br /> .................................................................22 a 5. Reclamation.................. <br /> ...................... <br /> 2. Substitute Materials.................................................................22(c) J. Signs&Markers.......................................................(816/817.11) <br /> 3. Storage and Protection.............................................................22(c) 1. Signs.....................................................................................I I(a),(b),&(c) <br /> 4. Redistribution..........................................................................22(d) <br /> 2. Markers......................................................................11(a),(b),(d),(e),&(fl <br /> D. Backfilling&Grading..............................(816/817.95-107) K. Distance Prohibitions.......................................................(761.11) <br /> 1. Exposed Openings.....................816/817.13, 14, 15,&823.11 &21 L. Revegetation..................................................... 816/817.111-116 <br /> 2. Contemporaneous Reclamation..................................................100 1. Vegetative Cover.......................................................(..............I 11 &116 <br /> 3. Approximate Original Contour..........................................102(a)(l)102 a 2) 2. Timing..................................................................................................]13 <br /> 4. Highwall Elimination......................................................... O( <br /> 5. Steep Slopes(includes downslope)......................................... <br /> 6. Handling of Acid&Toxic Materials......................................102(c) Page 2 of 2 <br /> 7. Stabilization(rills and gullies)..................................................95(b) Revised Decembe 4,1995 g <br />