Laserfiche WebLink
Snowcap Coal Company, Inc. -6- 2009 Annual Reclamation Report <br />16. Roadside Refuse Disposal Area - Re-contoured the refuse pile and <br />placed 20 inches of cover material and 6 inches of topsoil on all slopes <br />and benches. Seeded with approved seed mix during November. Located <br />in the SE'/ Section 34, Township 10 South, Range 98 West, 6th P.M. <br />Area - 8.4 acres <br />Date - November 2002 <br />Seed Mix - "Seed Mix, Table 14-8", Upland Components <br />17. Roadside South Portal Upper Diversion Ditch - This ditch was removed <br />and restored to approximate original contours during the excavation of the <br />Roadside Refuse Borrow Area. It was permanently seeded with an <br />approved seed mix during November of 2002. Located in the SE'/ <br />Section 34, Township 10 South, Range 98 West, 6th P.M. <br />Area - 1.1 acres <br />Date - November 2002 <br />Seed Mix - "Seed Mix, Table 14-8", Upland Components <br />18. Cameo Refuse Disposal Area No. 1 - Re-contoured upper bench, <br />regraded the top of the pile, covered all slopes, benches and the top of <br />the pile with 24 inches of material. Established collection ditches and rip- <br />rapped the ditches in accordance with the reclamation plan. This pile was <br />seeded during April 2002. Approximately one (1) acre was redisturbed in <br />December 2009 on top of CRDA #1 as a laydown area for coal refuse <br />delivered from McClane Canyon Mine and remaining SCC coal fines <br />clean up. Located in the SE'/, Section 28, Township 10 South, Range 98 <br />West, 6th P.M. <br />Area - 14.8 acres <br />Date - April 2002 <br />Seed Mix - "Seed Mix, Table 14-13", Upland Components <br />19. Cameo Refuse Disposal Area No. 2 - The final reclamation of this refuse <br />pile included covering and topsoiling the upper benches and the top of the <br />pile. Also a new diversion ditch was constructed just above the pile. The <br />Old Upper diversion ditch was reclaimed and restored to approximate <br />original contours and then reseeded. Located in the SE'/, Section 28 and <br />the SW'/, Section 27, Township 10 South, Range 98 West, 6th P.M. <br />Area - 20.2 acres <br />Date - April 2002 for CRDA2 and November 2002 for Upper Diversion <br />Seed Mix - For CRDA2 - "Seed Mix, Table 14-13", Upland Components <br />Seed Mix - For Upper Diversion - "Seed Mix, Table 14-8", Upland <br />Components <br />20. Cameo Borrow Area No. 2 - Material was excavated from CBA2 for the <br />covering of the CRDA1. Approximately 5.1 acres was seed in April 2002, <br />however a further disturbance will be needed here at the removal of Pond <br />11. Located in the SE'/, Section 28, Township 10 South, Range 98 West, <br />6th P.M. <br />Area - 2.7 acres