Laserfiche WebLink
Snowcap Coal Company, Inc. -4- - 2009 Annual Reclamation Report <br />Winterfat were increased in the mix that was used. <br />Area - 19 acres (Interseed) <br />Date - November 2005, September 2006 and February 2007 <br />Seed Mix - "Seed Mix, Table 14-14" <br />6. North Decline - treatment building, A-substation and power line between <br />A and A-substations. Located in E'/2NE'/ and NE'/SE'/, Section 34, <br />Township 10 South, Range 98 West, 6th P.M. <br />Area - 0.1 acres <br />Date - Spring 1993 <br />Seed Mix "Seed Mix, Table 14-9" <br />7. NW Intake Portal - Backfill portal located in NW'/NE'/, Section 34, <br />Township 10 South, Range 98 West, 6th P.M. <br />Area - 0.1 acres <br />Date - Summer 1993 <br />Seed Mix - No seed mix information on file. <br />8. Cameo Refuse Disposal Area No. 1 - Covered benches 1, 2, and 3. <br />Located in the SE'/ Section 28, Township 10 South, Range 98 West, 6th <br />P.M. <br />Area - 10.3 acres <br />Date - July 1994 <br />Seed Mix - "Seed Mix, Table 14-10" <br />9. Cameo Refuse Disposal Area No. 2 - Covered benches 1, 2, 3, and the <br />part of 4 south of the road. Located in the SE'/, Section 28 and the <br />SW'/o, Section 27, Township 10 South, Range 98 West, 6th P.M. <br />Area - 7.5 acres <br />Date - Benches 1 & 2 in July 1994 and benches 3 & 4 in December 1994. <br />Seed Mix - "Seed Mix, Table 14-10" <br />Inter-seeded previously seeded benches 1, 2, 3 and the part of 4 south of <br />the road per the recommendation of the 2001 vegetation study entitled <br />Revegetation Evaluation re: Diversity, Cedar Creek Associates, Inc., <br />September 2001. <br />Date - November 2001 <br />Seed Mix - "Seed Mix, Table 14-12" <br />10. Cameo Borrow Area No. 1 - Borrow area east of CRDA 1 which was <br />used for refuse pile cover material. Located in the SE'/, Section 28, <br />Township 10 South, Range 98 West, 6th P.M. <br />Area - 2.5 acres <br />Date - 1.2 acres in July 1994 and 1.8 acres in December 1994. <br />Seed Mix - "Seed Mix, Table 14-10"