Snowcap Coal Company, Inc. -8- 2009 Annual Reclamation Report <br />24. 2 West Portals - Substation of portal areas. Reference Exhibit 58. <br />Located in the NE'/, Section 11, Township 11 South, Range 98 West, 6th <br />P.M. <br />Area - 0.7 acres <br />Date - December 2001 <br />Seed Mix - "Seed Mix, Table 14-6" <br />25. Cameo Refuse Disposal Area Topsoil Piles - These piles were used for <br />top soiling the CRDA2 during final reclamation activities. Located in the <br />SE'/, Section 28, Township 10 South, Range 98 West, 6th P.M. <br />Area - 2.9 acres <br />Date - April 2002 <br />Seed Mix - "Seed Mix, Table 14-13", Upland Components <br />26. Conveyor Corridor - The conveyor corridor, from the Xcel culvert north to <br />Haul Road #3 was graded to approximate original contours and reseed. <br />Located in SE'/, Section 27 and NW'/, Section 34, Township 10 South, <br />Range 98 West, 6th P.M. A total of 0.46 acres in this area achieved final <br />Phase III Bond Release with SL-5, approved on November 5, 2009 (see <br />attached map). <br />Area - 2.7 acres <br />Date - July 2003 <br />Seed Mix - "Seed Mix, Table 14-8", Lowland Components <br />27. Conveyor Corridor - The conveyor corridor, from the Xcel culvert south <br />to Transfer Building #2 and east of Colorado River where conveyor tube <br />crossed river was graded to approximate original contours and seeded. <br />Located in SE'/o, Section 27 and NW'/, Section 34, Township 10 South, <br />Range 98 West, 6th P.M. A total of 1.34 acres in this area achieved final <br />Phase III Bond Release with SL-5, approved on November 5, 2009 (see <br />attached map). <br />Area - 1.6 acres <br />Date - March 2004 <br />Seed Mix - "Seed Mix, Table 14-8", Lowland Components <br />28. Substations A - Superstructures, fences, slabs and components <br />removed during 2007. Graded to approximate original contours and re- <br />seeded. Located in the SE'/ Section 34, Township 10 South, Range 98 <br />West, 6th P.M. <br />Area - 0.2 acres <br />Date - August 2007 <br />Seed Mix - "Seed Mix, Table 14-8", Upland Components <br />29. Roadside South Portal Mine Facilities and Stockpile/Prep Plant Area <br />and Conveyor Tunnel Under 1-70 - The Roadside South Portal Mine <br />Facilities, Stockpile and Prep Plant areas where reclaimed as per <br />approved Permit Revision #3 (PR-3). 13.5 acres were reclaimed during