My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-01-19_HYDROLOGY - C1996084
DRMS
>
Day Forward
>
Hydrology
>
Coal
>
C1996084
>
2010-01-19_HYDROLOGY - C1996084
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:58:39 PM
Creation date
1/19/2010 9:13:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
HYDROLOGY
Doc Date
1/19/2010
Doc Name
NPDES Modified Permit
From
New Elk Coal Company
To
DRMS
Permit Index Doc Type
NPDES
Email Name
KAG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART I <br />Page No. 7 <br />Permit No. COG-850000 <br />4. Effluent Limitations - Post Mining Areas <br />Post-mining limitations may apply to outfalls serving reclamation areas, which have been returned to the required contour <br />and on which revegetation (specifically, seeding or planting) work has commenced. Limitations may also apply to post <br />minine undereround mine areas. The permittee may request consideration for change from active mining limitations to <br />post-mining limitations when these conditions have been met. <br />a. Post Minine Reclamation Areas - This category is subject to 40 CFR Part 434 Subpart E (Post Mining Areas). The <br />following limitations apply to reclamation areas. The federal ELG limitations would apply until bond release. If these <br />wastewaters are combined with other waters under Part I.B.1, then those limitations shall apply. If this wastewater is <br />combined with post mining underground mine wastewater, then the limitations in Part I.B.3.b apply to the combined <br />discharge. Ifthis post mining wastewater is separate, then the following limitations apply. <br />Limitations Sample <br />Parameter 30-Day 7-Day Daily Rationale Fregitoring T <br />Avg... Ayr, Max. <br />General Permit Requirements <br />Flow, MGD <br />Report NA <br />Report <br />Discharge Evaluation Continuous / <br />z Recorder / <br />2 <br /> Instantaneous In-situ <br />pH, s.u. N/A NA 6.5-9.0 Water Quality Standards Weekly Grab <br />Total Suspended Solids, mg/1 30 45 NA State Effluent Regulations Weekly Grab <br />Oil and Grease, mg/1 N/A NA 10 State Effluent Regulations Weekly Visual 3 <br /> Federal Effluent Limitation Guidelines <br />Settleable Solids, ml/1 Report NA 0.5 Federal ELG Weekly Grab <br /> Site Specific Limitation <br />Total Dissolved Solids, mg/l * Report NA Report Salinity Regulations Quarterly ° Grab <br />Total Phosphorus (as P), mg/l •• Report NA Various Control Regulations Monthly Grab <br />Total Recoverable Iron, ug/1 1000 NA NA Water Quality Standards Weekly Grab <br />- Other Pollutants of Concern Various NA Various Water Quality Standards Weekly Grab <br />Whole Effluent Toxicity (WET) <br />Chronic Stat Diff and IC25 > IWC State Permit Limitations Quarterly 3 Grab/Test <br />Acute LC50 > 100% State Permit Limitations Grab <br />Footnotes 14, *, ** , and *** can be found under Part I.B.1 and Part I.B.2. <br />ALTERNATE LIMITATIONS FOR POST-MINING RECLAMATION AREAS <br />Any discharge or increase in the volume of a discharge from a reclamation area, caused by precipitation within any <br />24-hour period greater than the 10-year, 24-hour precipitation event (or snowmelt of equivalent volume) may <br />substitute the following limitations for these specific parameters only, subject to burden of proof requirements <br />described in Part I.B.6. <br />Limitations - Monitoring Sample <br />Parameter 30-Day 7-Day Daily Rationale' , Frequency <br />Avg. Av . __ Max <br />Federal Effluent Limitation Guidelines <br />Settleable Solids, ml/l Report NA Report Federal ELG Weekly Grab <br />b. Post Minine Underground Areas - This category is subject to 40 CFR Part 434 Subpart E (Post Mining Areas). The <br />following limitations apply to underground areas. The federal ELG limitations would apply until bond release. If <br />these wastewaters are combined with other waters under Part I.B.1, then those limitations shall apply. If this <br />wastewater is combined with post mining reclamation area wastewater, then these limitations apply to the combined <br />discharge. If the post mining wastewater is separate, then the following limitations apply. Discharges of mine <br />drainage from underground workings of underground mines which are not commingled with discharges eligible for <br />alternate limitations set forth in this section shall in no event be eligible for the alternate limitations set forth in this <br />section.
The URL can be used to link to this page
Your browser does not support the video tag.