Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task #: 004 <br />Date : 1210812009 <br />User: PSH <br />Agency or organization name: Colorado Department Of Reclamation, Mining And Safety <br />Permit or other job action : New Permit Bond Estimate <br />Task description : Replace Topsoil - 7.5 Acres <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D8R Series 11 - 8SU (200: Horsepower : 310 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 : NA <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $46.56 NA <br />Operating cost/hour : $70.63 100 <br />Ripper op. cost/hour : $0.00 NA <br />Operator cost/hour : $38.54 NA <br />Total unit cost/hour : $155.72 Total fleet cost/hour : $155.72 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 4,033 LCY factor : NA volume : 4,033 LCY <br />Source of estimated volume : Colorado Department of Reclamation, Mining and Safety <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION Job Condition Correction Factors <br />Operator skill : <br />0.75 Source <br />(avg.) <br />Average push distance : 200 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 491.9 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift/day) <br />Consolidated stockpile Spoil pile : 0.80 (fnd-ro <br /> Push gradient : 1.11 (Cat HB) <br />Average push gradient : 5.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 8,150 feet Material weight : 1.44 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 1,600 Ibs/LCY Net correction : 0.80 <br />Weight description <br />Top Soil <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) <br />Unit cost : $0.397 /LCY <br />State : Colorado <br />County : Grand <br />Site : Pickering Family Pit <br />Adjusted unit production <br />Adjusted fleet production <br />Permit/job# :M2009086 <br />Abbreviation :none <br />Filename : M086-004 <br />392.63 LCY/hr <br />392.63 LCY/hr <br />Total job time : 10.27 <br />Total job cost : $1,600 <br />Hours