Laserfiche WebLink
Table E-1 <br /> Area (acres) Topsoil Volume (CY) <br />Existing Wetland Areas 2.80 N/A <br />New Wetland Areas 1.50 4,517 <br />New Dryland Areas 2.70 4,356 <br />Lake Surface 22.90 N/A <br />Sediment Pond & Berms 2.40 3,872 <br />Undisturbed Areas 6.03 N/A <br />Tota 1 38.33 8,873 <br />The topsoil will be placed on finished slopes as they are made, eliminating the need for most <br />stockpiling. An excess of topsoil is present on the site, so no topsoil will need to be imported. <br />3 Haul Roads and Processing Area <br />Access to the pit will be from the existing internal haul roads of the Bunn Ranch Pit. See Map C- <br />2. All processing will take place on the Bunn Ranch site, which will be reclaimed as an industrial <br />site for gravel processing. A single internal haul road will be constructed along the south side of <br />the pit. This road will be reclaimed as dryland. <br />4. Reclamation Timetable <br />The time needed for reclamation is shown below. Exhibit L: Reclamation Costs describes the <br />worst case bond scenario. <br />Gehrman Pit October 09 E-2