Laserfiche WebLink
5. Nature of the construction activity: <br />Check the appropriate box(s) or provide a brief description that indicates the general nature of the construction activities. <br />(The full description of activities must be included in the Stormwater Management Plan.) <br />? Single Family Residential Development <br />? Multi-Family Residential Development <br />? Commercial Development <br />? Oil and Gas Production and/or Exploration (including pad sites and associated infrastructure) <br />? Highway/Road Development (not including roadways associated with commercial or residential development) <br />X ? Other, Describe: Extractive Industry, gravel processing <br />6. Anticipated construction schedule: <br />Construction Start Date: 6 /1 /2008 Final Stabilization Date: 6 /1 / 2023 <br />month day year month day year <br />The name of the receiving waters(s). (If discharge is to a ditch or storm sewer, also include the name of the ultimate <br />receiving water): no discharge all stormwaters contained onsi a in excavation area <br />STOP! A Stormwater Management Plan (see Appendix A) must be completed prior to signing the following certifications! <br />8. Stormwater Management Plan Certification: <br />"I certify under penalty of law that a complete Stormwater Management Plan, as described in Appendix A of this <br />application, has been prepared for my activity. Based on my inquiry of the person or persons who manage the system, <br />or those persons directly responsible for gathering the information, the Stormwater Management Plan is, to the best of my <br />knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for falsely certifying the <br />completion of said SWMP, including the possibility of fine and imprisonment for knowing violations." <br />z-e.1o <br />Signatu f Legally Respon le Person (submi ion must include original signature) Date Signed <br />Mr. Jay L Wagner President <br />Name (printed) Title <br />9. Signature of Applicant <br />"I certify under penalty of law that I have personally examined and am familiar with the information submitted in this <br />application and all attachments and that, based on my inquiry of those individuals immediately responsible for obtaining <br />the information, I believe that the information is true, accurate and complete. I am aware that there are significant <br />penalties for submitting false information, including the possibility of fine or imprisonment. <br />"I understand that submittal of this application is for coverage under the State of Colorado General Permit for Stormwater <br />Discharges Associated with Construction Activity for the entirety of the construction site/project described and <br />applied for, until such time as the application is amended or the certification is transferred, inactivated, or <br />expired." <br />Signatur f Legally Res risible Person (s mission must include original signature) Date Signed <br />Mr. Jay L Wagner President <br />Name (printed) Title <br />Application - Page 2 of 2 Revised 7/07