My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-30_PERMIT FILE - M2010002
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2010002
>
2009-12-30_PERMIT FILE - M2010002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:58:12 PM
Creation date
1/12/2010 7:48:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2010002
IBM Index Class Name
PERMIT FILE
Doc Date
12/30/2009
Doc Name
New 110c application
From
Wagner Rock LLC
To
DRMS
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.0 Inspection and Maintenance <br />This section provides a description of the procedures to inspect and maintain the <br />vegetation, erosion and sediment control measures and other BMPs identified in this <br />construction SWMP. In accordance with the permit requirements, the entire stormwater <br />management system will be inspected every 14 days during mining activities and after <br />any significant precipitation or snowmelt event that causes significant erosion. The <br />BMPs will be maintained in good and effective operating condition during mining <br />activities. <br />During Mining and hauling activities at the site, silt fences (if used) ditches <br />(where present) will be inspected for excessive sediment buildup that may infringe on the <br />freeboard. If such excessive sediment buildup occurs, the sediment will be removed, as <br />necessary. The stability of silt fences will be inspected for proper anchorage at the base, <br />for verticality of the fence supports and for fabric tears or rips. Appropriate repairs will <br />be made as necessary if significant problems are noted. Inspections, testing, and <br />preventive maintenance will be performed on all site equipment and operational systems. <br />This program will aim toward prevention of failures by adjustment, repair or replacement <br />of site equipment and /or structures. All excavating and hauling equipment will be <br />regularly inspected and maintained. <br />The administrators for the SWMP at this site will be Mr. Jay L. Wagner, President of <br />Wagner Rock,LLC, and a designated contract operator employee. They will be <br />responsible for the development, implementation, maintenance and revision of this <br />SWMP.
The URL can be used to link to this page
Your browser does not support the video tag.