Laserfiche WebLink
Exhibit-E <br />Mining Plan Map <br />Notes: <br />1. Seed topsoil stockpile if left longer then one year. <br />2. Concurrent reclamation; overburden to base of <br />excavation in compacted lifts, concurrent with mining. <br />3. All storm water contained in excavated area. <br />0' 100' 200' 300' <br />Topsoil stockpile <br />fence <br />Jay Wagner <br />Subject Property <br />approximately <br />8.2 ACRES <br />site total <br />day <br />o{ <br />a <br />0 <br />Seo?`oo <br />d <br />direction of mining <br />N <br />0 <br />a <br />Q ? <br />30' buffer along , <br />northwesterly fence line <br />Access <br />(lockable <br />double gate) <br />Crusher <br />approximately LJ 6.2 ACRES <br />pit area <br />Area for temporary o <br />overburden stockpiling prior T <br />to backfill and compaction 0 <br />if necessary <br />1204' N 88' W <br />30' buffer along south and east fence