Laserfiche WebLink
Colorado Division of Minerals and <br />Annual Reclamation Report for the Year_ <br />Hamilton Mine <br />mine name <br />permit # <br />Address: 2352 North 7th Street, Unit B, Grand Junction, CO 81501 <br />21.0 <br />This report, required by Rule 2.04.13, is due by February 15 of each year, or other date, as agreed upon <br />by the Division. It should include text, discussion, and maps, at a minimum, in addition to any other <br />reclamation monitoring data as required by the approved permit. The location of the acreage reported <br />under each land status category and year of seeding (if applicable) should be clearly and accurately <br />identified on a map included with the report. <br /> <br />Land Status Category Last Years <br />Cumulative Total <br />This Calendar Year <br />Cumulative Total' <br />Acres disturbed -0- -0- 111.2 <br />Acres backfilled and graded -0- -0- 90.2 <br />Acres to soiled -0- -0- 90.2 <br />Seeding typically begins the minimum 10-year reclamation liability period. Please report the acres for <br />each cateoorv helow Do not include arses that have nrhiPvPri final PhacA III rAlaaca <br /> Last Years <br /> Cumulative This Calendar Cumulative 10 years or Greater than <br /> Total year Total' less 10 ears' <br />Acres seeded" -0- -0- 90.2 0.0 90.2 <br />-incluae, It necessary, a description of any augmented seeding or cultural practices <br />The mine was seeded in 1993, 1995 and 1998. For puposes of "Greater than10 years" the 1998 date was used. <br />For the Entire Life of Mine, the total number of acres disturbed 111.2 <br />Phase I released 90.2 Phase II released -0- <br />For Mines in Permanent Cessation: <br />Total acreage in facilities subject to reclamation but yet to be completed <br />For Government Performance and Results Act <br />Acreage in long-term mining or reclamation facilities 2 <br />Acreage in active mining areas 3. <br />(exclude acres where Phase III release has been achieved) <br />Geology <br />2009 <br />Honeywood Coal Company <br />Permittee <br />and the total number of acres: <br />Phase III released -0- <br />21.0 <br />2 Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion and <br />collector ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and construction areas; <br />office area, repair shops, and parking; coal stockpiles, loading, and processing areas; railroads; coal conveyors; refuse piles and <br />coal mine waste impoundments; head-of-hollow fills; valley fills; ventilation shafts and entryways; and noncoal waste disposal area <br />(garbage dumps and coal combustion by-products disposal areas). <br />C-1991-078 <br />-0- <br />a Includes pits, topsoil stripped areas in advance of pits, and spoil not backfilled and graded