Laserfiche WebLink
NORTHWEST COLORADO CONSULTANTS, INC. <br />FIELD REPORT <br />Project: Refuse Pile Project No.: 99-3983 Date: 12/04/09 <br />Time: 5.0 <br />Location: Foidel Creek Mine Report No.: 54 Mileage: 44 <br />Client: Twentymile Coal Co. Engr. /Tech: CR <br />Work Performed: <br />As requested, we visited the project site on today's date and conducted compaction test No.'s 430 through 436 on <br />the material being placed in the Refuse Pile. <br />Twentymile Coal Company crews placed and compacted processed Waste Coal in the combined 2, 3, and 4 areas <br />of the Refuse Pile. <br />We also obtained a sample of material and returned it to our laboratory in Steamboat Springs, Colorado for <br />standard checkpoint Proctor testing. The sample matched a previous Proctor, 7P, for this project. <br />Remarks: <br />The material tested generally met the project specifications for compaction. <br />Please refer to the attached sheet for results of today's testing. <br />Verbal Discussions: <br />Twentymile Coal Co. was notified of today's test results.