My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-01-07_REVISION - M1996052 (6)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1996052
>
2010-01-07_REVISION - M1996052 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:20:42 PM
Creation date
1/11/2010 11:30:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1996052
IBM Index Class Name
REVISION
Doc Date
1/7/2010
Doc Name
Amendment Submittal
From
L.G. Everist, Inc.
To
DRMS
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-4- <br />12. Primarv future (Post-mining) land use (check one): <br />Lj <br />Cropland(CR) Pastureland(PL) <br />Rangeland(RL) Forestry(FR) <br />Residential(RS) Recreation(RC) <br />Developed Water Resources(WR) <br />13. Primary resent land use check one : <br />e • Cropland(CR) _ Pastureland(PL) <br />Rangeland(RL) Forestry(FR) <br />H Residential(RS) Recreation(RC) <br />Developed Water Resources(WR) <br /> General Agriculture(GA) <br /> Wildlife Habitat(WL) <br /> Industrial/Commercial(IC) <br /> Solid Waste Disposal(WD) <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />Industrial/Commercial(IQ <br />14. Method of Mining: Briefly explain mining method (e.g. truck/shovel): <br />Dozer and front end loaders remove material and load to conveyor for hauling to processing plant. <br />15. On Site Processing: _Z Crushing/Screening <br />13.1 Briefly explain mining method (e.g. truck/shovel): <br />Material is processed into specification aggregates using crushers, and screen plants <br />List any designated chemicals or acid-producing materials to be used or stored within permit area: <br />None <br />16. Description of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />This amendment adds 261.41 acres to the permit area. The mining methods do not change. <br />The reclamation plan is changed to develop the area as ponds and range land. The reclamation <br />methods do not change and the primary access remains as currently approved. This <br />amendment increases the reserves of gravel in the mine and the life of the mine.
The URL can be used to link to this page
Your browser does not support the video tag.