Laserfiche WebLink
-4- <br />12. Primarv future (Post-mining) land use (check one): <br />Lj <br />Cropland(CR) Pastureland(PL) <br />Rangeland(RL) Forestry(FR) <br />Residential(RS) Recreation(RC) <br />Developed Water Resources(WR) <br />13. Primary resent land use check one : <br />e • Cropland(CR) _ Pastureland(PL) <br />Rangeland(RL) Forestry(FR) <br />H Residential(RS) Recreation(RC) <br />Developed Water Resources(WR) <br /> General Agriculture(GA) <br /> Wildlife Habitat(WL) <br /> Industrial/Commercial(IC) <br /> Solid Waste Disposal(WD) <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />Industrial/Commercial(IQ <br />14. Method of Mining: Briefly explain mining method (e.g. truck/shovel): <br />Dozer and front end loaders remove material and load to conveyor for hauling to processing plant. <br />15. On Site Processing: _Z Crushing/Screening <br />13.1 Briefly explain mining method (e.g. truck/shovel): <br />Material is processed into specification aggregates using crushers, and screen plants <br />List any designated chemicals or acid-producing materials to be used or stored within permit area: <br />None <br />16. Description of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />This amendment adds 261.41 acres to the permit area. The mining methods do not change. <br />The reclamation plan is changed to develop the area as ponds and range land. The reclamation <br />methods do not change and the primary access remains as currently approved. This <br />amendment increases the reserves of gravel in the mine and the life of the mine.