Laserfiche WebLink
CONSTR& <br />It Enka- <br />7040 W. Hwy.. 160 AlemoM Co. 81101 (719)5896671 <br />EXHIBIT D <br />MINING PLAN <br />EXHIBIT D 1 of 2 <br />(A) Mining will be performed using standard earthmoving equipment. Jaw and cone <br />crushers along with screening plants, ground and stacking conveyors will be used <br />to process materials. One hundred percent of material obtained from the pit wall <br />can be processed through our equipment. No waste piles will be generated from <br />the mining operation <br />(B) Earthmoving shall be accomplished using dozers, scrapers or excavators to move <br />the material and rubber-tire loaders to feed the crushers and/or load material <br />directly into over-the-road trucks. <br />(C) No water diversion or impoundment's are necessary for this operation. <br />(D) The total area to be worked at any one time will be less than 15 acres. <br />(E). There is no definite timetable at which this project will be finished. The amount of <br />material that is available could last many years depending on local market <br />conditions and projects that are available to us. The operation will be an <br />intermittent operation. <br />(i). Each phase is estimated to be 3-5 years <br />(ii). The size of Phase IV reclamation will be 10.3 acres, Phase V <br />reclamation will be 10.3 acres, Phase VI reclamation will be 4.4 acres and Phase <br />VII will be 10.2 acres. <br />(iii). The sequence in each phase is the same and is as follows: <br />1. Remove topsoil <br />2. Stockpile topsoil to be available during reclamation <br />3. 3 to 1 side slopes will be maintained throughout mining in each phase <br />4. Topsoil will be spread a minimum of once per year to affected areas <br />5. Seed following overburden and topsoil distribution, once a sizeable <br />area of two to three acres is ready for seed. Seeding timetable is <br />estimated at two year intervals <br />(F) (i). Mining depth is expected to be less than 15'. All mined material can be sold. <br />The overburden will be stripped and stockpiled with the topsoil. If <br />groundwater is encountered, mining depth will be adjusting to stay above <br />ground water levels.