Laserfiche WebLink
C-1996-083 TR-65 <br />MLT Adequacy Review <br />08-Jan-2010 <br />Page 3 of 3 <br />Maleki Section 5.0 - Overburden Stability <br />Please provide a statement addressing potential (if any) impact to the anticipated <br />stability of the overburden that may be expected due to the proposed change in <br />orientation of the West Mains. <br />General Comments - Maas <br />Map 07 - Geology <br />• Was not submitted with the application; should be revised to show proposed TR- <br />65 changes <br />Map 09 - Hydrological Monitoring Location <br />• The Legend does not provide a description of the solid brown area. <br />Map 27 - Subsidence <br />• The heavy red and purple lines that represent the burn limits for the B and D <br />Seams are not identyled in the legend <br />• Subsidence Monuments 37-A thru 37-D are `proposed" with TR-65, but the <br />symbol used does not reflect that status. <br />• The legend does not have a symbol for the electric transmission line. <br />• The legend does not have a symbol for the transmission towers. <br />• The Outcrop-D line is missing for the eastern portion of the map. <br />• While there are UTMgrid crosshairs on the map, there is no North arrow. <br />This concludes my comments for TR-65. Please do not hesitate to contact me with any <br />questions that may arise. <br />cc: Sandy Brown, DRMS