My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-01-08_REVISION - C1996083
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2010-01-08_REVISION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:58:27 PM
Creation date
1/11/2010 8:28:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
REVISION
Doc Date
1/8/2010
Doc Name
Letter Regarding Questions and Comments Adequacy Review
From
DRMS
To
Bowie Resources, LLC
Type & Sequence
TR65
Email Name
JJD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Date : 06-Jan-10 Permit C-1996-083 Site: Bowie No. 2 M ine <br />User: JRS State : Colorado <br /> Filename: C083-350a County: Delta <br />Agency Name: Colorado Division of Reclamation, Mining and Safety <br />Permit Action: Technical Revision 65 - Minor Revision 104 Credits <br /> <br />Task Task Description TASK HOURS DIRECT COST <br /> <br />351 <br />352 <br />353 <br />354 <br />355 <br />356 Regrade Drill Pad 192 (Not implemented - 100% Credit) <br />Regrade New Road Spur to Drill Pad 192 (Not implemented - 100% Credit) <br />Replace Topsoil from Stockpile to Drill Pad 192 (Not implemented - 100% Credit) <br />Replace Topsoil from Stockpile New Road Spur to Drill Pad 192 (Not implemented - 100% Credit) <br />Reseed Drill Pad 192 (Not implemented - 100% Credit) <br />Reseed New Road Spur to Drill Pad 192 (Not implemented - 100% Credit) 10.69 <br />27.79 <br />5.75 <br />14.55 <br />2.10 <br />5.40 $2,219 <br />$5,768 <br />$1,194 <br />$3,020 <br />$1,437 <br />$3,695 <br /> <br /> Direct Cost Total 66.28 $17,333 <br /> <br /> INDIRECT COSTS <br /> <br /> Overhead and Profit <br /> Liability Insurance (1.55% of Direct Costs) <br />Performance Bond (1.05% of Direct Costs) <br />Job Superintendent (at $42.25/hour) <br />Profit (10.00% of Direct Costs) <br /> <br />33.14 $269 <br />$182 <br />$1,400 <br />$1,733 <br /> <br /> <br /> Total Overhead and Profit $3,584 <br /> <br /> Contract Amount (Direct Costs + Overhead and Profit) $20,917 <br /> <br /> <br /> Legal - Engineering - Project Management <br />Engineering Work and Contract/Bid Preparation (4.25% of Contract) <br />Reclamation Management and Administration (3.25% of Contract) <br />$889 <br />$680 <br /> <br /> <br /> NOTE: Revision was not implemented - Credit is for entire liability amount <br /> <br /> <br /> TOTAL CREDIT AMOUNT -$22,486
The URL can be used to link to this page
Your browser does not support the video tag.