Laserfiche WebLink
CIRCES Cost Estimating Software <br />BOREHOLE SEALING WORK <br />PROJECT IDENTIFICATION <br />Task #: 211 State : Colorado Permit/job #: C-1996-083 - <br />Date : 0110612010 County :Delta Abbreviation :none <br />User : JRS Site :Bowie No. 2 Mine Filename :C083-211 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other lob action :Technical Revision 65 <br />Task description: Plug and Seal One Geotech Hole <br />A/n Shift basis : 1 per day <br />BOREHOLE DESCRIPTION SEALING ITEM / METHOD DIAMETER LENGTH QUANTITY UNIT UNIT COST T OTAL COST <br />-Bottom Plug PVC plug - 4 in. 3.8" 700 LF 1.00 EA $61.37 $61.37 <br />-- ---------------------------- <br />-Fill Hole with Cement <br />Portland cement grout <br />3.8" <br />700 LF <br />28.00 <br />bag <br />$10.65 <br />$298.2 <br />-Cut Casing at Surface Exp. casing removal, 4-8 in. 3.8" NA 1.00 LF $5.71 5.7 <br />--------------- <br />------------------- - --- <br />-Borehole Marker <br />Borehole marker <br />NA <br />NA <br />1.00 <br />EA <br />$3.72 <br />3. <br />72 <br />-Drill Rig Time TLAS COPCO ROC D3-01, 3. NA NA 4.00 HR $144.49 _____$577.96 <br />-Water Truck Time Water Tanker, 2, 500 Gal. NA NA 4.00 HR $60.90 $243.61 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> ------ ---- - ------ -- <br /> <br /> <br />-- - -------------- - <br />- ----------- <br /> <br /> <br /> <br /> <br /> <br />- ---------------- <br /> <br /> <br /> <br /> <br /> --- ---- - -------- <br /> <br />-------- ------ ----- ------- - --- --------- <br /> <br /> - ----- -------- <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />JOB COST Total Cost : : i7,7J7