Laserfiche WebLink
........................................r ?..........................i. Client / On Site Rep: <br />Project: GEOTECH I Bowie Resources 15- Bear <br /> <br />. <br />................................................. ............... ........... <br />...................................................................................................... Contractor / Rep: <br />Bowie Mine Gob Pile Stability Civil, Structural & Geotechnical Engineers <br />Loadout Services / S. West <br />222 South Park Ave. • Montrose, C:O 61401 <br />: (970) 249.6828 • T=AX: (970) 249.0945 Technician: <br />Ph <br />. <br />Project No: Date: <br />2005126-CMT 10/22/2009 CONSTRUCTION MATERIALS TESTING LABORATORY L. Sanchez <br />DAILY COMPACTION REPORT <br />TEST TYPE MAX DRY OPTIMUM DRY MOISTURE PERCENT NOT SOIL LAB SAMPLE <br />LOCATION <br />GRADE ELEV <br />TEST Embankment Gob - Gob Pile No. 2 DENSITY MOISTURE DENSITY CONTENT COMPACTION vJITFIIN TYPE NUMBER <br />NUMBER =NUCSAND (pcf) CONT. (%) (pcf) (%) SPEC <br />Center Slope <br />(PT#4457) N19493.50/E37509.30 6133.3 X 97.0 8.8 90.7 11.0 93.5 gob #316 r/c @ 35% <br />316 <br />8 <br />. <br />% <br />317 (PT#4458 N19468.01/E37400.86 6134.3 X 97.3 9.3 97.7 11.0 100.4 gob #317,r/c @ 2 <br />318 (PT#4459) N19468.63/E37229.59 6133.1 X 101.1 8.9 97.6 10.5 96.5 gob #318 r/c @ 28% <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />MOISTURE / DENSITY SPECIFICATIONS OBSERVATION I TESTING FIELD OBSERVATIONS <br /> Date: Compaction Equipment Used: <br />Specified <br />Compaction Cohesive Soils X Full Time: Day: S M T W Th F S <br />Requirement: 90% Cohesionless Soils X Sheepsfoot: <br /> Part Time: Weather: Sun Clear Overcast Rain Snow <br />R <br />ll <br /> x X er. <br />o <br />Smooth Drum <br />5peafled <br />Cohesive Soils X <br />Moisture <br />Number of site visits/Day: <br />Temp: <br />To 32 <br />32-S° <br />5D-70 <br />70-85 <br />85 up <br />N/A <br />Requirement: Cohesionless Soils x x Vibratory: <br /> Testing Only: A Wind: Still <br />V Mod High <br />r--V-1 <br />l <br />): <br />Li <br />t B <br />O <br />h <br /> Requested By (Company Name): X e <br />ow <br />er ( <br />s <br />t <br />Laboratory Testing ASTM-D Cohesive Soils X B. Bear/Bowie Resources Humidity: Dry Mod Humi Haul traffic <br />Procedure: 698 X <br />Cohesionless Soils <br />DENSITY / COMPACTION I ESIING WAS NOT PERFORMED Insufficient amount Informed (Rep of Company) of Test Results: <br />Buckhom was not informed prior <br />ON THIS DATE FOP, THE FOLLOWING REASONS: of material placed. Steve West / Loadout Services to our arrival on site that the <br />Contractor Not Working Due To: The Contractor Is: contractor would not be wonting <br /> Field Copies Given To: on this date. <br />Inclement Weather: Procrssing Frozen Material: Processing Wet Material: <br /> Contractor: <br />ti <br />lf <br />t M : =Moisture Conditioning Dry Matt: <br />and/or Grubbin <br />i <br />in <br />St Client; <br />unc <br />on: <br />a <br />Equipmen g <br />r <br />pp <br />g <br /> CM/GM: PAGE 1 OF 1 <br />Unknown: <br />L ...... Stockpiling Fill; =Removing Unsuitable Mat;: <br />I E?] Other: <br />05-126-CMT Bowie Mine Gob Pile Stability.xis DCR10-22-091s#316-ap