Laserfiche WebLink
Project: _._-.-..._?..._......... . <br /> <br />• GEOTECIF9 : <br />Client On Site Rep: <br />Bowie Resources / B. Bear <br />Bowie Mine Gob Pile Stability Civil, Structural & Geotechnical Engineers <br /> <br />CO 81401 <br />Cflntra Contractor /Rep: <br />B <br />Bowie Resources /Tracy Matekoovic <br /> 222 South Park Ave. - Montrose. <br />Project No: <br />2005126-CMT Date: <br />12/16/2009 Ph.: (970) 249.6826 - FAX: (970) 249.0945 <br />CONSTRUCTION MATERIALS TESTING LABORATORY Technician: <br />L. Sanchez <br />DAILY COMPACTIO N REPORT <br /> LOCATION TEST TYPE MAX DRY OPTIMUM DRY MOISTURE PERCENT nor SOIL LAB SAMPLE <br />TEST <br />NUMBER Embankment Gob -Gob Pile No. 2 <br />Center Slope GRADE ELEV <br />[NUC <br />SAND DENSITY <br />(Pcf) MOISTURE <br />CONT. (%) DENSITY <br />(pcf) CONTENT <br />(%) COMPACTION wm+IN <br />SPEC TYPE NUMBER <br />328 PT#4469 N19488.03/E37416.95 6140.7 X 100.9 8.8 79.7 14.5 79.0 X gob #324 & 325 <br /> r/c @ 21% <br />329 PT#4470 N19567.83/E37352.01 6137.8 X 106.2 8.3 101.5 11.6 95.6 gob #324 & 325 <br /> r/c @ 30% <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />MOISTURE / DENSITY SPECIFICATIONS OBSERVATION / TESTING FIELD OBSERVATIONS <br />Specified Date: Compaction Equipment Used: <br />Compaction 90% Cohesive Soils X <br />Requirement: Cohesioniess Soils Full Time: Day: S M T W <br />X Th F S <br />Sheepsfoot: A <br /> Part Time: Weather: Sun Clear Overcast Rain Snow <br />Specified x X Smooth Drum Roller: <br />Moisture Cohesive Soils X <br />Requirement: N/A Cohesionless Soils Number of Site Visits/Day: Temp: To 32 <br />x 32-50 <br />X 50-70 70-85 85 Up <br />Vibratory: <br /> Testing Only: Wind: Still Mod High <br /> Requested By (Company Name): X X Other (List Below): <br />Laboratory Testing ATM ' Cohesive Soils X <br />Procedure: D 69$ <br />Cohesionless Soils Tracy Matekoovic /Bowie Resources Humidify: Dry <br /> <br />X Mod Humid Haul traffic <br />DENSITY / COMPACTION TESTING WAS NOT PERFORMED <br />ON THIS DATE FOR THE FOLLOWING REASONS: Insufficient amount <br />of material placed. Informed (Rep of Company) of Test Results: <br />Tracy Matekoovic & B. Bear <br />Buckhorn was not informed prior <br />to our arrival on site that the <br />Contractor Not Working Due To: The Contractor Is: Bowie Resources contractor would not be working <br /> <br />Inclement weather: <br /> <br />Equipment Malfunction: <br />Processing Frozen material: processing Wet Material: <br /> <br />stripping and/or Grubbing: Moisture Conditioning Dry Mat'i: Field Copies Given To: <br /> <br />Contractor: <br />Client: on this date. <br /> <br />Unknown: <br />Stockpiling Fin: =Removing unsuitable Matt: CM/GM: <br />Other: PAGE I OF I. <br />05-126-CMT Bowie Mine Gob Pile Stability.xls DCR12-16-091s#328-sj