My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-01-07_REPORT - C1996083
DRMS
>
Day Forward
>
Report
>
Coal
>
C1996083
>
2010-01-07_REPORT - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:58:24 PM
Creation date
1/8/2010 12:41:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
REPORT
Doc Date
1/7/2010
Doc Name
4th Quarter 2009 Waste Bank/GOB Pile Monitoring
From
J.E. Stover & Associates
To
DRMS
Permit Index Doc Type
Waste Pile/Fill Report
Email Name
JJD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: -` Client / On Site Rep: <br />¦ 1?? GE®TECH i <br />Bowie Resources / B. Bear <br />Bowie Mine Gob Pile Stability Contractor / Rep: <br />Civil, Structural & Geotechnical Engineers <br />222 South Park Ave. - Montrose, CO 81401 Bowie Resources / Tracy Matekoovic <br />Project No: <br />2005126-CMT Date: <br />12/2/2009 Ph.: (970) 249-6828 - FAX: (970) 249-0945 Technician: <br />CONSTRUCTION MATERIALS TESTING LABORATORY L. Sanchez <br />DAILY COMPACTIO N REPORT <br /> <br />NUM ER LOCATION <br />Embankment Gob - Gob Pile No. 2 <br />Center Slope <br />GRADE ELEV TEST TYPE <br />NUC SAND MAX DRY <br />DENSITY <br />(pct) OPTIMUM <br />MOISTURE <br />CONT. (%) DRY <br />DENSITY <br />(pct) MOISTURE <br />CONTENT <br />(%) PERCENT <br />coMPAcnoN NOT <br />wrrHlN <br />SPEC SOIL <br />TYPE LAB SAMPLE <br />NUMBER <br />326 PT#4467 N13581.84/E37410.05 6138.5 X 105.1 8.3 98.2 13.9 93.4 gob #324 & 325 <br /> r/c @ 30.7% <br />327 PT#4468 N19510.80/E37512.32 6139.1 X 92.7 8.4 85.0 11.0 91.7 gob #324& 325 <br /> r/c @ 31.0% <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />MOISTURE / DENSITY SPECIFICATIONS OBSERVATION / TESTING FIELD OBSERVATIONS <br />Specified Date: Compaction Equipment Used: <br />Compaction 90% + Cohesive Soils X <br />Requirement: Cohesionless Soils Full Time: Day: <br />L M <br />- I T w <br />X Th F S <br />Sheepsfoot: <br /> Part Time: Weather: Sun Clear Overcast Rain Snow <br />Specified X <br />Smooth Drum Roller: <br />Moisture Cohesive Soils X <br />Requirement: N/A Cohesioniess Soils Number of Site visits/Day: Temp: To 32 <br />X 32-50 <br />X 50-70 70-85 85 Up <br />Vibratory: <br /> Testing Only; ? Wind: Still Mod High <br /> <br />L <br />b <br />t <br />T <br />ASTM-D <br />i Requested By (Company Name): X Other (List Below): <br />a <br />ora <br />ory <br />est <br />ng <br />Cohesive Soils <br />Procedure: 698 <br />Cohesionless Soils Tracy Matekoovic / Bowie Resources Humidity: Dry <br /> <br />X Mod Humid Haul traffic <br />DENSITY / COMPACTION TESTING WAS NOT PERFORMED <br />ON THIS DATE FOR THE FOLLOWING REASONS: l Insufficient amount <br />of material placed. Informed (Rep of Company) of Test Results: <br />Tracy Matekoovic & B. Bear <br />Buckhorn was not informed prior <br />Contractor Not Working Due To: The Contractor Is: Bowie Resources to our arrival on site that the <br />t <br />t <br />ld <br />b <br /> <br /> <br />Inclement Weather: <br /> <br />Equipment Malfunction: <br /> <br />Processing Frozen material: Processing Wet Material: <br /> <br />Stripping and/or Grubbing: Moisture conditioning Dry Mat'!: <br />Field Copies Given To: <br /> <br />Contractor: <br />Client: con <br />rac <br />or wou <br />not <br />e working <br />on this date. <br /> <br />Unknown: <br />Stockpiling Fill: Removing unsuitable Mat'i: CM/GM: <br />Other: PAGE I OF I <br />05-126-CMT Bowie Mine Gob Pile Stability.xis DCR11-23-091s#324 (2)-cc
The URL can be used to link to this page
Your browser does not support the video tag.