Laserfiche WebLink
Project: --. ..._--•--._,_ : _-._......... Client / On Site Rep: <br />GEOTECH Bowie Resources / B. Bear <br />Bowie Mine Gob Pile Stability Contractor / Rep: <br />Civil, Structural & Geotechnical Engineers <br />222 South Park Ave. - Montrose, CO 81401 Loadout Services / S. West <br />Project No: Date: Ph.: (970) 249-6828 • FAX: (970) 249.0945 Technician: <br />2005126-CMT 11/10/2009 CONSTRUCTION MATERIALS TESTING LABORATORY L. Sanchez <br />DAILY COMPACTION REPORT <br /> LOCATION TEST TYPE MAX DRY OPTIMUM DRY MOISTURE PeRCENT NOT SOIL LAB SAMPLE <br />TEST <br />NUMBER Embankment Gob - Gob Pile No. 2 <br />Center Slope GRADE ELEV <br />F NUC <br />SAND DENSITY <br />(Pc' MOISTURE <br />CONT (%) DENSITY <br />(pc`) CONTENT <br />M comPACIION wrrHIN <br />SPEC TYPE NUMBER <br />322 PT#4463 N19573.84/E37328.95 6138.37 X 106.8 9.2 104.4 11.1 97.9 gob #230 r/c @ 24% <br />323 PT#4464 N19483.54/E37322.42 6138.08 X 100.1 8.9 95.3 14.5 95.2 gob #318 r/c @ 28% <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />MOISTURE / DENSITY SPECIFICATIONS OBSERVATION / TESTING FIELD OBSERVATIONS <br />Specified Date: Compaction Equipment Used: <br />Compaction Cohesive Soils X <br />Requirement: 90%+ Cohesionless Soils Full Time: 0 Day: 5 M T <br />X W Th F S <br />Sheepsfoot: 0 <br /> Part Time: Weather: Sun Clear Overcast Rain Snow <br />Specified X Smooth Drum Roller: <br />Moisture N/A Cohesive Solis X <br />Requirement: Cohesionless Soils Number of Site Visits/Day: Temp: To 32 32-50 <br />x 50-70 <br />X 70-85 85 Up <br />Vibratory: <br /> Testing Only: Wind: Still Mod High <br /> Requested By (Company Name): X X Other (List Below): <br />Laboratory Testing ASTM-D Cohesive Soils <br />Procedure: 698 <br />Cohesionless Soils B. Bear / Loadout Services Humidity: Dry <br /> <br />X Mod Humid Haul traffic <br />DENSITY / COMPACTION TESTING WAS NOT PERFORMED <br />ON THIS DATE FOR THE FOLLOWING REASONS: Insufficient amount <br />of material placed. Informed (Rep of Company) of Test Results: <br />M.West & S. West / Loadout Services <br />B <br />was not informed prior <br /> <br />Contractor Not Working Due To: <br />The Contractor Is: t <br />o our <br />to our arrival on site that the <br />contractor would not be workin <br /> <br /> <br />Inclement Weather: <br /> <br />Equipment Malfunction: <br /> <br />Processing Frozen Material: ?Prixessing Wet Material: <br /> <br />Stripping and/or Grubbing: Moisture Conditioning Dry Mall: <br />Field Copies Given To: <br /> <br />Contractor: <br />Client: g <br />on this date. <br /> <br />Unknown: <br />stockpiling Fill: Removing Unsuitable Mat'l: CM/GM: <br />Other: PAGE 1 OF 1 <br />05-126-CMT Bowie Mine Gob Pile Stability.xls DCR11-10-091s#322-cc