My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-01-07_REPORT - C1981035 (2)
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981035
>
2010-01-07_REPORT - C1981035 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:58:24 PM
Creation date
1/7/2010 1:13:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
REPORT
Doc Date
1/7/2010
Doc Name
2009 Annual Reclamation Report (KI & KII)
From
GCC Energy, LLC
To
DRMS
Permit Index Doc Type
Annual Reclamation Report
Email Name
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colorado Division of Reclamation, Mining and Safety <br />Annual Reclamation Report for the Year <br />2009 <br />King I C-1981-035 GCC Energy,LLC <br />mine name permit # Permittee <br />Address: 4424 C R 120, Hesperus, CO 81326 <br />This report, required by Rule 2.04.13, is due by February 15 of each year, or other date, as agreed upon <br />by the Division. It should include text, discussion, and maps, at a minimum, in addition to any other <br />reclamation monitoring data as required by the approved permit. The location of the acreage reported <br />under each land status category and year of seeding (if applicable) should be clearly and accurately <br />identified on a map included with the report. <br /> Last Years This Calendar <br />Land Status Category Cumulative Total Year Cumulative Total' <br />Acres disturbed 10.88 + 0.00 = 10.88 <br /> <br />Acres backfilled and graded 0.50 + 0.00 = 0.50 <br /> <br />Acres to soiled 0.50 + 0.00 = 0.50 <br />Seeding typically begins the minimum 10-year reclamation liability period. Please report the acres for <br />... &. ,, .?,.,.,..,, k-l.,,., nn nn4 inrll,eio arrnc that have nrhiPVPr1 final- Phase III release. <br />calif <br />Last Years <br />This <br />Greater <br /> Cumulative Calendar Cumulative 10 years or than 10 <br /> Total year Total' less ears' <br />Acres seeded" 0.50 + 0.00 = 0.50 = 0.50 + 0.50 <br />*include, if necessary, a description of any augmented seeding or cultural practices <br />For the Entire Life of Mine, the total number of acres disturbed 10.88 and the total number of acres: <br />Phase I released 0.00 Phase 11 released 0. 00 Phase III released 0.00 <br />For Mines in Permanent Cessation: <br />Total acreage in facilities subject to reclamation but yet to be completed N/A <br />For Government Performance and Results Act <br />Acreage in long-term mining or reclamation facilities z 10.88 <br />Acreage in active mining areas s 10.88 <br />'(exclude acres where Phase 111 release has been achieved) <br />2 Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion and <br />collector ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles-, repair, storage and construction areas; <br />office area, repair shops, and parking; coal stockpiles, loading, and processing areas; railroads; coal conveyors; nonbackfilled and <br />graded areas of refuse piles, coal mine waste impoundments, head-of-hollow fills, and valley fills; ventilation shafts and entryways; <br />and noncoal waste disposal area (garbage dumps and coal combustion by-products disposal areas). <br />3 includes pits, topsoil stripped areas in advance of pits, and spoil not backfitled and graded
The URL can be used to link to this page
Your browser does not support the video tag.