Laserfiche WebLink
McClane Canyon Mining LLC <br />Water Sampling Report <br />Date: 11/16/09 <br />Weather Conditions: Clear, 35 degrees F. <br /> Surface Water <br />Sample <br />Point Time Flow <br />cfs pH EC <br />umhos/cm Temp (C) <br />SW -1 1:12 PM Dry - - - <br />SW -2 1:40 PM Dry - - - <br />SW -3 12:16 PM Dry - - - <br />SW -4 11:53 AM Dry - - - <br />SW -5 1:40 PM Dry - - - <br />SW-6 12:18 PM _ Dry <br />- <br />- <br />- <br />SW 7 12:18 PM Dry <br />- <br />- <br />- <br />SW 8 11:59 AM Dry <br />- <br />- <br />- <br /> <br /> Ground Water <br />Sample <br />Point Time SWL <br />feet PH EC <br />umhos/cm Temp (C) <br />GW 1 12:41 PM 13.3 7.5 7000 11.6 <br />GW 3 12:05 PM 38.5 7.0 4500 11.2 <br />GW 6 12:15 PM Dry-18.8' <br />GW 9 1:16 PM 27.1 7.2 9300 11.5 <br />Location of Points/Wells <br />SW -1 East Salt Creek above McClane under haul road bridge <br />SW -2 McClane Creek at culvert below mine <br />SW-3 Munger Creek at haul road culvert below mine <br />SW -4 East Salt Creek -2 miles downstream of SW -8 <br />SW -5 McClane Creek above mine site at culvert inlet <br />SW-6 Munger Creek below mine before north split <br />SW -7 Munger Creek above Mine <br />SW -8 East Salt Creek between Munger and McClane Creeks at bridge <br />SWX McClane Creek at confluence with East Salt Creek <br />Fourth Quarter 2009 <br />Sampled by: Jim Stover <br />Meters Calibrated: Yes <br />GW 1 Alluvium of East Salt Creek about 3 Miles above McClane - TD 14.3' <br />GW 3 Alluvium of East Salt Creek just below Munger Canyon - TD 47.3' <br />GW 6 In Munger Canyon at the permitted waste rock disposal area - TD 18.8' <br />GW-9 Alluvium of East Salt Creek below proposed waste rock disposal area - TD 53.5 <br /> <br />GW 1 <br />Total Depth Feet <br />14.3 <br />[.°o <br />GW 3 Total Depth 47.3 <br />GW 6 Total Depth 18.8 Depth revised when pipe was damaged '` 3 <br /> during gob pile construction. <br />GW-9 Total Depth 53.5 <br /> ® ICP <br /> <br /> v <br />v <br /> q <br />