Laserfiche WebLink
PROJECT IDENTIFICATION <br />Date : 06-Jan-10 Permit C-1996-083 Site: Bowie No. 2 M ine <br />User: JRS State : Colorado <br /> Filename: C083-270a County: Delta <br />Agency Name: Colorado Division of Reclamation, Mining and Safety <br />Permit Action: Technical Revision 65 - Technical Revision 52 Credits <br /> <br />Task Task Description TASK HOURS DIRECT COST <br /> <br />271 Plug and Seal 13 Gob Vent Boreholes (Credit for 9,575 of 22,660 feet - 42.26%) 65.92 $40,044 <br />272 Regrade Drill Pads (Credit for 4 of 13 not constructed - 30.77%) 43.55 $9,039 <br />273 Regrade Light-Use Roads (Credit for 0.7 of 2.7 miles not constructed - 25.93%) 44.57 $9,250 <br />274 Replace Topsoil from Stockpile to Drill Pads (Credit for 4 of 13 not constructed - 30.77%) 19.76 $4,100 <br />275 Replace Topsoil from Stockpile to Light-Use Roads (Credit for 0.7 of 2.7 miles not constructed - 25.93%) 19.30 $4,006 <br />276 Reseed Drill Pads (Credit for 4 of 13 not constructed - 30.77%) 8.38 $5,731 <br />277 Reseed Light-Use Roads (Credit for 0.7 of 2.7 miles not constructed - 25.93%) 7.04 $4,819 <br /> <br /> <br /> <br /> <br /> Direct Cost Total 208.52 $76,989 <br /> <br /> INDIRECT COSTS <br /> <br /> Overhead and Profit <br /> Liability Insurance (2.02% of Direct Costs) $1,555 <br /> Performance Bond (1.05% of Direct Costs) $808 <br /> Job Superintendent (at $41.25/hour) 104.26 $4,301 <br /> Profit (10.00% of Direct Costs) $7,699 <br /> <br /> Total Overhead and Profit $14,363 <br /> <br /> Contract Amount (Direct Costs + Overhead and Profit) $91,352 <br /> <br /> Legal - Engineering - ProjectManagement <br /> Engineering Work and Contract/Bid Preparation (4.25% of Contract) $3,882 <br /> Reclamation Management and Administration (3.25% of Contract) $2,969 <br /> <br /> <br /> <br /> TOTAL CREDIT AMOUNT -$98,204