My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-09-18_PERMIT FILE - C1981018A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981018A
>
2009-09-18_PERMIT FILE - C1981018A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:55:31 PM
Creation date
1/6/2010 12:30:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018A
IBM Index Class Name
Permit File
Doc Date
9/18/2009
Doc Name
B-Vent Shaft #2, SH-1, SH-2, RDH#3
Section_Exhibit Name
Map 155
Media Type
M
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(� 24- <br />57 <br />cMP <br />..I 11 <br />12' CMP <br />a <br />Upland <br />Ago <br />CAIN <br />A <br />Top <br />Soil <br />Air Dryer <br />0 <br />H -3 <br />cs \ <br />Br thable <br />air i 'ection <br />hole <br />fve <br />aft I <br />i <br />■ <br />CO enerra or <br />a g <br />•• 0i <br />\ Upland Div rsion Scale: = 50' <br />C <br />0 <br />Scale: V-- 50' <br />e: 11 = <br />Escape Hoist <br />Head Frame <br />st <br />0 <br />s <br />"CMP <br />e <br />Concrete lined <br />B -Vent Shaft #2 <br />Compressors ��� � Construction Details <br />generator !t' <br />Scale: 1" = 25' <br />B -Vent Shaft #2 Facilities <br />1 <br />1 Revised power muting <br />8/14/2007 <br />2 <br />Revised power muting, added RDH -3, etc. <br />2/26 /2008 <br />3 <br />Added breathable air hole @ RDH -3. <br />121512008 <br />4 <br />Added buildings to N2 plant @ RDH -3. <br />8/13/2009 <br />(MR142) <br />K. <br />et.■■a <br />Daft <br />ct <br />ra <br />Bodsim <br />L <br />V-P Scale: 1" 15' <br />SH -2 Fluid Storage <br />Notes: <br />- See Illustration 53 (153) for culvert hydrologic modeling /sizing calculations. <br />- SH -1 is for concrete transfer to underground workings. <br />- SH -2 is for fluid storage and transfer to underground workings. <br />Bulk tanks to be placed in concrete containment structure sized to hold volume of <br />largest tank plus precipitation. <br />- Road and active surfaces or pads are to be graveled. <br />- B -Vent Shaft #2 to be fenced to preclude public access. <br />—P—P —P— Power line <br />Map 155 <br />BLUE MOUNTAIN ENERGY, INC. <br />DESERADO MINE RANGELY, COLORADO <br />13-Vent Shaft #2, SH -1, SH -2, RDH #3 <br />yy by- sCW D■g. Fite Ne=e: <br />Ma 155.dw <br />k. by Appr. by: 114 R I ( jZ <br />Date <br />various 4/17/2007 l] $lCl <br />
The URL can be used to link to this page
Your browser does not support the video tag.