Laserfiche WebLink
2. This is already the case, but the table has been modified to provide further clarity. <br />6. DRMS is requiring a minimum of two sampling times for a full set of laboratory testing at the <br />surface water sampling sites. Western Fuels will sample each location in February and August of <br />each year. The text has been updated to reflect this. <br />Each element addressed in this adequacy response has required the modification of the text or <br />maps of the permit, and the appropriate pages and maps have been attached. As per the original <br />submittal of this technical revision, the pages of text submitted for review have the changes from <br />the original permit highlighted for DRMS's convenience. Once the technical revision is <br />approved, a complete replacement copy of Section 2.04.7 will be submitted to DRMS with the <br />updated table of contents and page numbering. <br />Please contact me with any questions or comments. <br />Sincerely <br />Ben Langenfeld, Projec ngineer <br />Greg Lewicki and Associates <br />