Laserfiche WebLink
.7 <br />J V VAVEIONIC� _ PROPRIETARY & CONFIDENTIAL <br />Mine Water Treatment — Peabody Energy Page 12 of 48 <br />4.1.5 Final Design Specification <br />The final activity in the design process includes detailed product and <br />system configuration drawings, electrical and hydraulics specifications, as <br />well as a site specific Operations & Maintenance Manual. The final output <br />of this activity would be a final report covering product and turn -key <br />implementation schedule. The completion of this activity would enable <br />Water Tectonics to proceed with procurement, fabrication and installation <br />of the proposed process water treatment system. <br />r1 <br />L_J <br />Document Version: 4.0 © Water Tectonics, Inc. 2008. All rights reserved. / <br />W WATERTECTONICS <br />