My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-24_INSPECTION - C1980007
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1980007
>
2009-12-24_INSPECTION - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:58:06 PM
Creation date
1/5/2010 12:47:46 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
INSPECTION
Doc Date
12/24/2009
Doc Name
Inspection Report
Inspection Date
12/16/2009
Email Name
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
///. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made during <br />the inspection. Comments also describe any enforcement actions taken during the inspection and the <br />facts or evidence supporting the enforcement action. <br />This was a partial inspection conducted by Tom Kaldenbach of DRMS. Ryan Sweetwood of <br />Mountain Coal Company represented the operator. <br />With the operator's consent, this report was issued from the Denver office of DRMS. <br />The longwall was active more than half-way through E-Seam Panel 1. The ground in most areas was <br />covered with more than one foot of snow, which limited inspection. <br />Hydrolnic Balance <br />No discharge was occurring at the mine water discharge site in Sylvester Gulch (CDPS outfall 017). <br />Construction of the recently approved pond MB-5E has not begun. <br />Processing Waste <br />Much of the equipment has been removed from the top of the LRP in preparation for the recently <br />approved construction of a coal processing plant at this location. There was no activity on the RPE. <br />Support Facilities <br />No problems were found in facility areas in Sylvester Gulch, the materials storage bench, or at the rail <br />loadout. <br />General Mine Plan Compliance <br />The operator appeared to be following the approved mine plan. <br />Documents Received <br />None. <br />3
The URL can be used to link to this page
Your browser does not support the video tag.