Laserfiche WebLink
Moores Pit, Phase IV <br />Equipment: Dozer Avg. Push Grade: 17% Avg. Push Distance: 60 ft <br />Avg. Haul Grade: 3% Avg. Haul Distance: 250 ft <br />ITEM <br />DESCRIPTION <br />UNIT <br />QUAN. <br />UNIT <br />PRICE <br />TOTAL <br />1 <br />Mobilization <50 mi. <br />EA <br />2 <br />$1,000.00 <br />$2,000.00 <br />2 <br />Place 2 ft. Overburden Soil <br />CY <br />8,050 <br />$1.50 <br />12,075.00 <br />3 <br />Plant Type "A" Seed and Mulch <br />AC <br />0.3 <br />$600.00 <br />180.00 <br />4 <br />Plant Type "B" Seed and Mulch <br />AC <br />2.5 <br />$750.00 <br />1,875.00 <br />5 <br />"Biosol" Fertilizer <br />AC <br />2.8 <br />$250.00 <br />700.00 <br />Subtotal <br />$16,830.00 <br />6 <br />Indirect Costs <br />LS <br />842.00 <br />Subtotal <br />$17,672.00 <br />7 <br />Project Management <br />LS <br />707.00 <br />TOTAL <br />$18,379.00 <br />