3. Water Consumption for the Operation and Water Rights <br />A small amount of water will be required in the operation to control dust. There will not be any <br />wash plants or any other plants or equipment which will use water at this time, but if in the <br />future there are such plants or equipment, the Division of Reclamation, Mining, and Safety will <br />be notified as well as the Division of Water Resources to ensure that adequate water is available <br />for the proposed plants or equipment. <br />Dust will be controlled by water as needed. Water will only be used to spot water roads when <br />conditions on the access roads and in the pit warrant the use of water to control dust. Based on <br />previous experience in the Korinek Pit, it is not expected that much water will be required to <br />control dust. It is not expected that water is needed for the screening plant since the production is <br />below levels that CDPHE considers for these controls. Water for the dust control in this <br />operation will be taken from the groundwater sump on the pre -law area of the permit. 2.0 acre - <br />feet per year will be allocated to dust control, or 0.17 acre -feet per month. <br />Total annual depletions from the gravel and shale mining operations are estimated to be 2.04 <br />acre -feet per year during the mining phase. <br />4. Water Control/Diversion <br />The terrain around Korinek Pit #1 is generally flat and is sloping slightly (0 — 2% grade) towards <br />the Arkansas River. In order to avoid problems with storm water and possible contamination, an <br />isolation berm will be built around the pit highwall as seen on Map C -2. Also berms will be built <br />along the south side of the pit to contain stormwater in the pit. This will isolate stormwater on <br />site and allow it to seep into the ground. During mining, a pair of run -off retention berms and <br />sumps will be constructed on the southeast corner of the permit area to retain run -off from <br />disturbed areas. Once the site is reclaimed, all stormwater containment structures will be <br />removed. No such control structures will be placed on the southwest end since that area is <br />reclaimed and therefore will not be disturbed any more. <br />Korinek #1 Pit August 09 G -2 <br />