My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-29_REVISION - M1979131 (12)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1979131
>
2009-12-29_REVISION - M1979131 (12)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:55:53 PM
Creation date
1/5/2010 7:54:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979131
IBM Index Class Name
REVISION
Doc Date
12/29/2009
Doc Name
Adequacy Response
From
Greg Lewicki and Associates, PLLC
To
DRMS
Type & Sequence
CN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINING PLAN <br />1 -H. General Minine Plan <br />EXHIBIT D <br />The property boundary has been surveyed on site and the permit area will be surveyed and marked <br />prior to any site disturbance. Map C -2 shows the mining plan. <br />The access to the site will be from County Lane 15, which approaches the site from the north. The <br />gravel deposit is mostly flat with 0 to 4 inches of topsoil, 6 to 10' of overburden, and gravel <br />thickness of approximately 20' -k". It is underlain by approximately 30 feet of Pierre Shale. Both <br />the gravel and the shale will be mined yew around, but in varying quantities depending on <br />demand. <br />Topsoil will be salvaged from all Mining Areas. The expected thickness of topsoil is <br />approximately 4 inches. lbpsoil will be placed in the isolation berm around the pit as it is stripped <br />Initial merburden will be stockpiled in the pit but will be used to reclaim the site as mining <br />progresses. Gravel will be mined and taken to the crusher /screeier by the loader. Minim" will lie <br />conducted in nine phases which minimizes disturbed area and allows reclamation to take place <br />concurrently with mininst Minim, will proceed from thQ current mining area north into the <br />additional acreage Stockpiles will be placed within the mining^-° -' he minod --u <br />pfe • ; :1iiii++eQ area to minimize disturbance areas. Once ample room is created within the <br />current pit, the overburden that is encountered will be placed within this area. As mining <br />progresses into the new area to the north, overburden encountered will be used to reclaim <br />previously disturbed area. The direct placement of this overburden reduces the cost of mining and <br />eliminates work that will be needed during reclamation. This allows the total disturbed area to be <br />as small as possible. Volumes of material are shown in Table D -1 Mining Area Material Table. <br />The mining areas and stockpiles are shown on Map C -2. <br />Korinek 91 Pit Augusl 09 D -1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.