Laserfiche WebLink
7. Monitorine Reclamation Success <br />Monitoring the reclamation on an ongoing basis will allow minor revisions to en essure <br />successful reclamation. The operator plans to use the local NRCS office to assist in determining <br />the ability of the reclaimed land to control erosion. If minor changes or modifications are needed <br />to the seeding and reclamation plan, revision plans will be submitted to the Division as required. <br />It is hoped that the Division will provide assistance in evaluating the success of the ongoing <br />reclamation process. All areas disturbed and reclaimed and any other important items regarding <br />the reclamation will be submitted in the annual reports to the Division. <br />Korinek #1 Pit August 09 E -7 <br />