Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimatinci Software <br />TRUCK/LOADER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name DRMS <br />Task # : TOP State : Colorado <br />Date: 1212112009 County : Park <br />User: D82 Site :Alma Placer Gold <br />Permit or other job action : Bond Update for Gold Operation <br />Task description: Spread topsoil <br />HOURLY EQUIPMENT COST Shift basis: 1 per day <br />�Eouipment Description <br />Truck/loader team -Truck : <br />-Loader: <br />Cat 769D <br />CAT 980G high lift (2001) <br />Support equipment -Load area <br />-Dump area : <br />NA <br />Cat D8R Series Il - 8SU (2005) <br />Road maintenance -Motor grader <br />-Water truck :Water <br />CAT 135H <br />Tanker, 2,500 Gal. <br />Cost Breakdown: <br />Truck/Loader Work Team <br />Truck Loading Tool <br />Support Equipment <br />Load Area Dump Area <br />Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : <br />truck2 <br />loader <br />NA <br />dozer <br />grader <br />misctruk <br />% Utilization-machine: <br />97 <br />100 <br />NA <br />100 <br />100 <br />25 ___ <br />- Ripper attachment: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour : <br />$52.27 <br />$41.36 <br />NA <br />$46.56 <br />$19.88 <br />$8.32 <br />Operating cost/hour : <br />$67.44 <br />$50.28 <br />NA <br />$70.63 <br />$25.31 <br />Ripper op. cost/hour : <br />NA <br />NA <br />NA <br />$0.00 <br />$0.00 <br />__ <br />N A_ <br />Operator cost/hour: <br />$22.29 <br />$38.72 <br />NA <br />$38.54 <br />$24.50 <br />$38.70 <br />Unit subtotals : <br />Number of units : <br />$142.00 <br />$130.36 <br />NA <br />$155.72 <br />$69.69 <br />$50.49 <br />1 <br />2 <br />1 <br />0 <br />1 <br />1 <br />Group subtotals :1 <br />Work: $414.36 <br />Support: $155.72 <br />Maintenance : $120.17 <br />Total work team cost/hour : $690.26 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 9,438 LCY factor : NA volume: 9 ,438 LCY <br />Material weight: 1,600 pounds /LCY Struck volume <br />Descr. Soil Heaped volume <br />Rated payload: 82,000 pounds Average volume <br />Payload capacity : 51.25 LCY Adjusted volume` <br />Final truck volume based on number of loader passes <br />' truck volume adjusted to not exceed rated payload or heaped volume <br />21.60 <br />31.70 <br />26.65 <br />31.70 <br />25.90 <br />LCY <br />LCY <br />LCY <br />LCY <br />LCY <br />Loading Tool Capacity: <br />Job Co ndition Corrections: <br />Site altitude (ft.) : <br />10 ,000 <br />Rated capacity (nom. heaped) : 7.000 LCY <br />Truck <br />Loader <br />Source <br />Descr.: Loose material - 118" to 318" (90 - 955 <br />Altitude adj.: 0.930 <br />1.000 <br />(C at H_8)_ <br />Bucket fill factor : 0.925 <br />Job efficiency: 0.830 <br />0.830 <br />(1 shift/day) <br />Adjusted bucket capacity: 6.475 LCY <br />Net correction : 0.772 <br />0.830 <br />Permit/job # : M - 1985 - 029 <br />Abbreviation : none <br />Filename : MO29 -TOP <br />