Laserfiche WebLink
CIRCES Cost EstimatinaSoftware <br />DEMOLITION WORK <br />PROJECT IDENTIFICATION Agency or organization name DRMS <br />Task #: DEM <br />Date : 21 -Dec -2009 <br />User: D82 <br />Permitting action :Bond update <br />Slate : Colorado <br />County : Park <br />Site Alma Placer (Gold Facility) <br />Permitljob# : M- 198 -029 <br />Abbreviation : none <br />Filename : MO29 -DEM <br />Task description Demo / Removal / Disposal <br />UNIT COSTS Last unit cost update: March 2009 Location adjustment : 100.00% <br />STRUCTURE or ITEM DESCRIPTION <br />DIMENSIONS <br />DEMOLITION MENU SELECTION <br />QUANTITY <br />UNIT <br />UNIT COST <br />TOTAL COST <br />-Prep Plant <br />60x50x1st <br />Demo. /disp. /appr. dump - to 60 mi. <br />36,000.00 <br />CF <br />$1.2037 <br />$43,331.89 <br />-Pu House _ <br />10x10x1st <br />Demo. /disp./appr. dump - to 60 mi, <br />800.00 <br />CF <br />$1.2037 <br />$962.93 <br />-Guard shack <br />8x10x8 <br />Demo. /disp. /appr. dump - to 60 mi. <br />640.00 <br />CF <br />$1.2037 <br />$770.34 <br />- Portable Tr <br />variable <br />Haul /mi., 12 -18 CY T.- 30 mph avg. <br />150.00 <br />MI <br />$1.0990 <br />$164.85 <br />- Foundations _ <br />variable <br />Demo. /disp. exc. pit, 12" th. -200 R. <br />500.00 <br />SF <br />$3.4688 <br />$1,734. <br />_ <br />- Conveyors <br />100 x 3 <br />10x10x10 <br />Conveyor, elevated- 5' W x 6'H <br />Demo. /disp. /appr. dump - to 60 mi. <br />100.00 <br />1,000.00 <br />LF <br />CF <br />$41.3104 <br />$1.2037 <br />$4,131.04 <br />$1,2 <br />- Pro cessing Equip <br />- Storage tank _ <br />20000 gal <br />Liquid pickup -5000 gal. vac. truck <br />32.00 <br />HR <br />$177.7500 <br />$5,688.00__ <br />-Pipe removal <br />variable <br />Pipe, sewerAvater - 12 in. diam. <br />500.00 <br />LF <br />$6.2244 <br />$ 3,112.20 <br />_ <br />-Pip loading _ _ <br />500 LF <br />Load only, open area - Track Idr. <br />20.00 <br />CY <br />$0.3850 <br />_ _ <br />-P ha u li ng _ _ <br />500 LF <br />Haul /mi., 12 -18 CY T.- 30 mph avg. <br />100.00 <br />MI <br />$1.0990 <br />_$ 7.70 <br />$109.90 <br />-Pipe dis posal _ <br />500 LF <br />Dump tees - Building constr. mat. <br />20.00 <br />CY <br />$90.0000 <br />_ <br />$1,800.00 <br />_ <br />JOB COST Subtotal (unadjusted): $63,017 Total Cost (adjusted for location): $63,017 <br />