My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-30_INSPECTION - M1985029
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1985029
>
2009-12-30_INSPECTION - M1985029
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:58:11 PM
Creation date
1/5/2010 7:53:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985029
IBM Index Class Name
INSPECTION
Doc Date
12/30/2009
Doc Name
Insp Rpt
From
DRMS
To
Alma Placer Company LLC
Inspection Date
12/18/2009
Email Name
DB2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />i <br />CIRCES Cost EstimatinaSoftware <br />DEMOLITION WORK <br />x <br />PROJECT IDENTIFICATION _ Agency or organization name DRMS <br />Task #: DEM State : Colorado Permitfjob# : M- 1985 -029 <br />Date: 21 -Dec -2009 County : Park Abbreviation : none - --- - - <br />User : DB2 Site : Alma Placer - Gravel Filename : MO29 -DEM <br />Permitting action : Bond update <br />Task description : Demo / removal / disposal <br />z <br />UNIT COSTS Last unit cost update: March 2009 Location adjustment:_ 96.83% <br />STRUCTURE or ITEM DESCRIPTION <br />DIMENSIONS <br />DEMOLITION MENU SELECTION <br />QUANTITY <br />UNIT <br />UNIT COST <br />TOTAL COST <br />-Truck scale <br />Ik <br />Demo.1disp. exs. pit, 12" th. -10K ft. <br />600.00 <br />SF <br />$3.4166 <br />$2,049.95 <br />- Crusher _ _ _ <br />-Wash pla <br />ook <br />Load 15 mi. haul, slvg. - Steel fr. <br />125.00 <br />CY <br />$7.8700 <br />$983. _ <br />ok <br />Load 15 mi. haul, slvg. - Steel fr. <br />125.00 <br />CY <br />$7.8700 <br />____$9 <br />_ _ <br />- Sc Pl ant <br />ok <br />Load 15 mi. haul, slvg. - Steel fr. <br />125.00 <br />CY <br />$7.8700 <br />$983.75 <br />_ _ <br />- Employee T railers <br />ok <br />Load 15 mi. haul, slvg. - Steel fr. <br />250.00 <br />CY <br />$7.8700 <br />$1,967.5 — <br />-Lab trailer <br />ok <br />Load15 mi. haul, slvg. - Steel fr. <br />95.00 <br />CY <br />$7.8700 <br />$747.65 <br />- Asphalt Plant <br />- Con veyors <br />ok <br />Load 15 mi. haul, slvg. - Steel fr. <br />3 <br />CY <br />$7.8700 <br />$23,610.00 <br />ok <br />Conveyor, elevated - 5'W x 6'H <br />200.00 <br />LF <br />$41.3104 <br />_$ 8,26 2. 07 <br />_ <br />-Fuel rem oval <br />ok <br />Liquid pickup -5000 gal. vac. truck <br />100.00 <br />HR <br />$177.7500 <br />$17,775 <br />Pipe <br />5001f <br />Pipe, CMP - 8 in. diam. <br />500.00 <br />LF <br />$1.6589 <br />- - - $829.46 — <br />JOB COST Subtotal (unadjusted): $58,193 Total Cost (adjusted for location): $56,348 <br />. _. w .. <br />�x <br />
The URL can be used to link to this page
Your browser does not support the video tag.