Laserfiche WebLink
i <br />Subtotals <br />ROADABLE EQUIPMENT <br />$113.88 <br />sheet 2 of 2 <br />Machine <br />Total <br />Fleet Size <br />Haul Trip <br />Return Trip <br />Description <br />Cost/hour /unit <br />(No. units) <br />Cost/hr /fleet <br />Cost/hr /fleet <br />-CAT 13 <br />Transportation Cycle Time : <br />$69.69 <br />1 <br />$69.69 <br />$69.69 <br />_ <br />-Water Tanker, Z500 Gal. <br />Roadable <br />$44.19 <br />1 <br />$44.19 <br />$44.19 <br />Equipment <br />Equipment <br />Haul time (hours) = <br />0.80 <br />Subtotals <br />1 $113.88 <br />$113.88 <br />EQUIPMENT HAUL DISTANCE and TIME <br />Nearest major city or town within project area region : <br />Breckenridge <br />Transportation Cycle Time : <br />Non- <br />Total one -way travel distance : <br />20.0 miles <br />Roadable <br />Roadable <br />Average travel speed : <br />25.0 mph <br />Equipment <br />Equipment <br />Haul time (hours) = <br />0.80 <br />0.80 <br />Total non - roadable mob /demob cost * : <br />$4,920.10 <br />Return time (hours) = <br />0.80 <br />0.80 <br />• two round trips with haul rig <br />Loading time (hours) = <br />1.00 <br />NA <br />Total roadable mob /demob cost ** : <br />$182.21 <br />Unloading time (hours) = <br />1.00 <br />NA <br />•• one round trip, no haul rig <br />Subtotals = <br />3.60 <br />1.60 <br />M <br />JOB TIME AND COST <br />Total job time . <br />7.20 hours <br />Total job cost: <br />$5,102 <br />