Laserfiche WebLink
c;TAT F. CA F <br />)Q <br />DIVISION OF RECLAM MINING AND SAFETY <br />Department of,Natural R6ources <br />1313 Sherman S'., Room 21 <br />Denver, Colorado 80203 IV, C-0 L I 0. R ON <br />AD 6 F <br />1 <br />D I V I S 1 0 N <br />� L TIO <br />Phone: (30 8 RE M M <br />FAX- (303? 83106 M 1 N 1 N NJ �4 GG <br />SAFETY�% <br />Bill Ritter, Jr. <br />Governor <br />' January 1,,2010 <br />Harris D. Sherman <br />Ixecutive Director <br />Ronald W. Cattany <br />Mr. Tim ..Cornrher Division Director., <br />Manger Environmental Resources Natural Resource Trustee <br />Cripple ,Creek'and Victor Gold Mining Company <br />P. Box ,191 <br />Victor,,Colbrado 80860' <br />Re. Pt M-1980-244 Cresson Project, Quality Assurance Monitoring,and Test Results Liner <br />Recertification acceptance Letter <br />D'e6r Mr: .:Com mer: <br />The Division of Reclamation Mining and Safety has reviewed the Quality Assurance, ) Monitoring and Test <br />Result s, for the Liner recertification that was deployed under Amendment # 8 but was'not certified at <br />th�atiime clueio.a.small area that could not be certified by the Desigh in 2004. The <br />area in question was exposed and new liner deployed in accorclance:with't;116 approved specification for <br />the. site. <br />, 7he Division l'hacl inspected the new deployed liner and verified that the a rea ih.qu6stion had been <br />replaced with new 1iner. New deployed liner was walked and inspected and was founclAo.be in 9 ood <br />repait._The Division accepts the rectification report and all the.inform-'ation requested fro <br />m the 20045 <br />QA/QC: is included. You may now commence loading the pad -as'a pprbved - in 1hebriginal- p lan for <br />Ph ase IV. <br />If you have questiom.-please contact me at (303) 866-3567 ext 8129. <br />- Sin;cerel Y, <br />Berhan KeffeleW <br />Environmental: Protection Specialist <br />