Laserfiche WebLink
V) Exhibit L Reclamation Cost 6.4.12 <br />A) The detailed reclamation cost estimate is for 10 acres. During the per - operational <br />inspection DRMS and the operator observed the old 110 area, even though it had <br />been reported not to be affected, is already affected and the operator is going to <br />utilize these areas as temporary top soil storage area and temporarily reclaim <br />these areas. Does the 10 acre cost estimate provide include these areas or phases <br />1 and II of the conversion application. What about the 5 acres that will be utilized <br />as processing and storage areas? Please explain. <br />B) The cost estimate also includes the reconstructing of approximately 100 feet <br />3HAV, slopes on 15 ft high wall with 50 ft benches every 10 vertical feet. However, <br />under the mining plan, the narrative states the benches if required will be every 15 <br />ft vertical high wall height. Please explain. <br />If you have questions please contact me at (303) 866 -3567 ext 8129. <br />Sincerely, <br />Berhan Keffelew <br />Environmental Protection Specialist <br />