My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-10-02_PERMIT FILE - C1996083A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2009-10-02_PERMIT FILE - C1996083A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:55:57 PM
Creation date
12/30/2009 2:40:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
10/2/2009
Section_Exhibit Name
Volume III Exhibit 10 Air Pollution Emission Permits
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />d <br />...Co <br />COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT <br />AIR POLLUTION CONTROL DIVISION * <br />TELEPHONE: (303) 692-3150 * <br />` <br />* 1876 <br />CONSTRUCTION PERMIT <br />PERMIT NO: 03DLO923F <br />INITIAL APPROVAL <br />DATE ISSUED: September 27, 2006 MODIFIC,4TION - 2 <br />ISSUED TO: Bowie Resources, LLC <br />THE SOURCE TO WHICH THIS PERMIT APPLIES IS DESCRIBED AND LOCATED AS FOLLOWS: <br />Surface activities to support underground coal mining at Bowie No. 2 Mine, <br />located approximately 4 miles east of Paonia, in Delta County, Colorado. <br />• THE SPECIFIC EQUIPMENT OR ACTIVITY SUBJECT TO THIS PERMIT INCLUDES THE FOLLOWING: <br />Coalmine waste (gob) handling, hauling, stockpiling, and reclamation activities. <br />THIS PERMIT IS GRANTED SUBJECT TO ALL RULES AND REGULATIONS OF THE COLORADO <br />AIR QUALITY CONTROL COMMISSION AND THE COLORADO AIR POLLUTION PREVENTION <br />AND CONTROL ACT C.R.S. (25-7-101 et sea), TO THOSE GENERAL TERMS AND CONDITIONS <br />INCLUDED IN THIS DOCUMENT AND THE FOLLOWING SPECIFIC TERMS AND CONDITIONS: <br />1. All previous versions of this permit are canceled upon issuance of this permit. <br />2. Within one sixty (60) days after issuance of this permit, compliance with the conditions <br />contained on this permit shall be demonstrated to the Division. It is the permittee's <br />responsibility to self certify compliance Aith the conditions. Failure to demonstrate <br />compliance may result in revocation of the permit. (Information on how to certif}, <br />compliance was mailed with the permit.). A plan of action required under Control <br />Measures shall accompany the self-certification. <br />3. The particulate emission control measures listed on the attached page (as approved by the <br />Division) shall be applied to the particulate emission producing sources as required by <br />Regulation No. 1, Section III.D. Lb. <br />This permit is for materials handling related activities only; any process equipment (i.e. <br />crushers, screens, etc.) to be located at this site must have a separate permit from the <br />. Division. (Reference: Regulation No. 3. Part B. Section III.E_) <br />Page 1 of 5 <br />AIRS Point ID: 029.0049:016 <br />MR-90 <br />AP,PRauc,D
The URL can be used to link to this page
Your browser does not support the video tag.