Laserfiche WebLink
0 2.03.5 Compliance Information <br />(3)(c) No administrative or judicial actions. <br />(3)(d) The violation has been abated. <br />(3)(e) The applicant constructed ditches, cross drains and sediment control devices in <br />order to control and minimize erosion. <br />(3)(f) The notice of violation was terminated by the Division of Reclamation Mining & <br />Safety on March 17, 2009. <br />is <br />• <br />SO-3 2.03-10 06/09 <br />A PPkovQb <br />9/o/a9