Laserfiche WebLink
• The companies that performed the work are very familiar with analytical <br />techniques and standardized procedures for sampling of soils, water, and <br />coal. Furthermore, the dates of collection and analysis work are <br />included in the applicable Sections. Additionally, in those parts of <br />this application where technical data are presented, the personnel <br />directly responsible for its collection and analysis are identified, <br />together with the dates of collection and analysis, and methodologies <br />used. <br />A tremendous effort by many technical personnel and professional groups <br />was undertaken in preparation of information included within this <br />application. Time, expense, and many man hours have been devoted to the <br />collection, analysis, and organization of the technical data submitted <br />in this permit application. The personnel by organization who have <br />collected, analyzed, and/or assisted in the development of the technical <br />data and other information contained within this revision are listed <br />below: <br />CJ <br />• <br />Bear Coal Company <br />William Bear <br />Independent <br />President & General Manager <br />ACZ INC. <br />Engineering & Environmental Division <br />737 Lincoln Avenue, P.O. Box 772961 <br />Steamboat Springs, Colorado 80477 <br />Alan W. Czarnowsky Mining Engineer <br />Jon F. W. Pratt Associate Engineer <br />Sherry L. Yates Project Assistant <br />Tim Smith Technical Coordinator <br />Eldon D. Strid Mining Engineer <br />2.03-2 <br />