Laserfiche WebLink
• <br />GEOMEMBRANE REPAIR VACUUM TEST LOG <br />PROJECT NUMBER: <br />OWNER: <br />LOCATION: <br />Vacuum Box No. <br />84201125EO <br />Cripple Creek and Victor Gold Mining Company <br />Phase IVa Re- certification <br />1 <br />PROJECT TITLE: <br />CONTRACTOR: <br />CC &V CCA Phase 5 <br />Lonestar <br />Test No. <br />Defect Code <br />Test Date <br />Tech ID <br />Defects <br />OBS. Test <br />Mon. <br />Remarks <br />1 <br />12 <br />11/12/2009 <br />DF <br />HT Heat Tack Burn <br />YES <br />TW <br />R3 <br />2 <br />11 <br />11/12/2009 <br />DF <br />SI Soil Surface Irregularity <br />YES <br />TW <br />R4 <br />3 <br />10 <br />11/12/2009 <br />DF <br />YES <br />TW <br />R5 <br />4 <br />9 <br />11/12/2009 <br />DF <br />YES <br />TW <br />R7 <br />5 <br />8 <br />11/12/2009 <br />DF <br />YES <br />TW <br />R8 /DS -2 <br />6 <br />7 <br />11/12/2009 <br />DF <br />YES <br />TW <br />R9 <br />7 <br />6 <br />11/12/2009 <br />DF <br />YES <br />TW <br />R10 <br />8 <br />16 <br />11/12/2009 <br />DF <br />YES <br />TW <br />R15 <br />9 <br />5 <br />11/12/2009 <br />DF <br />YES <br />TW <br />R11 <br />10 <br />1 4 <br />11/12/2009 <br />DF <br />YES <br />TW <br />R12 <br />11 <br />2 &3 <br />11/12/2009 <br />OF <br />YES <br />TW <br />R13 <br />12 <br />15 <br />11/12/2009 <br />DF <br />YES <br />TW <br />R6 <br />13 <br />14 <br />11/12/2009 <br />DF <br />YES <br />TW <br />R1 <br />14 <br />13 <br />11/12/2009 <br />DF <br />YES <br />TW <br />R2 <br />15 <br />1 <br />11/12/2009 <br />DF <br />YES <br />TW <br />R14 <br />16 <br />17 <br />11/12/2009 <br />OF <br />YES <br />TW <br />R16 <br />4P "4" Panel INT. <br />5P "5" Panel INT. <br />AD Animal Related Damage <br />B Undispersed Resin Bead <br />BO Fusion Welder Burn <br />BS Boot /Skirt for FML Penetration <br />CO Change of overlap <br />CR Crease <br />D Installation Damage <br />DS Destructive Test Number <br />� <br />�I <br />Reviewed By: JDH <br />11/12/2009 <br />EE Earthwork Equipment Damage <br />SL Slag on Textured Sheet <br />EXT Extension <br />T Three Panel Intersection <br />FM Fishmouth <br />VL Vacuum Test Leak <br />FS Failed Seam Length <br />WR Wrinkle <br />FTS Field Test Strip <br />WS Welder Restart <br />HT Heat Tack Burn <br />FR Fly Rock <br />10 Insufficient Overlap <br />FPT Failed Pressure Test <br />MD Manufacturer /Delivery Damage <br />Other <br />PT Pressure Test Cut <br />SI Soil Surface Irregularity <br />Page 1 of 1 <br />AMEC Earth and Environmental <br />