My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-21_REVISION - M1980244 (32)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2009-12-21_REVISION - M1980244 (32)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:24 PM
Creation date
12/30/2009 8:54:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
12/21/2009
Doc Name
QA Liner Recert- App. E, Tech Specs. 2
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec <br />C. Piping shall be placed to the lines and elevations shown on the DRAWINGS, with no sags or humps, <br />as approved by MANAGER and CERTIFYING ENGINEER. <br />3.02 PIPE CONNECTIONS <br />A. All connections for non - perforated pipe shall be watertight under maximum anticipated pressure head. <br />B. The ends of all pipe shall be capped with a manufactured pipe cap. <br />C. All connections in non - perforated pipe will be watertight. <br />D. HDPE pipe will be butt - heat - fusion welded in accordance with the MANUFACTURER's guidelines. <br />E. CPe pipe joints shall conform to MANUFACTURER's recommendations. <br />3.03 BEDDING AND BACKFILL <br />A. CONTRACTOR shall place and compact Leak Detection Fill in accordance with Item 3.06.E of <br />Section 02200.0. <br />B. CONTRACTOR shall bed and backfill Leak Detection piping with Leak Detection Fill. <br />C. Low Volume and High Volume Solution Collection pipe shall be placed on top of the geosynthetics <br />as shown on the DRAWINGS. <br />D. Placement of Low Volume and High Volume Solution Collection pipes shall be coordinated with <br />other operations such as Low Volume Solution Collection Fill, Bedding Fill, Soil Liner, and Drain <br />Cover fill placement. Equipment access directly on geosynthetics is expressly prohibited. Any <br />damage to the geosynthetics caused by CONTRACTOR during pipe placement shall be repaired at <br />the expense of CONTRACTOR. <br />E. A minimum of 5 feet of Low Volume Solution Collection Fill and Drain Cover Fill shall be placed <br />over the top of the pipe before crossing with rubber -tired construction equipment. If pipe becomes <br />crushed during or after installation by CONTRACTOR's equipment or methods of construction, the <br />pipe shall be replaced by CONTRACTOR, at no additional cost to CC &V. The CONTRACTOR <br />will be required to demonstrate to MANAGER that the equipment and procedures used are not <br />detrimental to the piping, at no additional cost to CC &V. <br />F. CONTRACTOR shall hold pipes in place with sand bags, or other methods approved by <br />MANAGER, until the Low Volume Solution Collection Fill and Drain Cover Fill has been placed. <br />Directly before placement of the Low Volume Solution Collection Fill and Drain Cover Fill, the sand <br />bags will be removed. <br />G. Secondary or tertiary High Volume Solution Collection pipes will be attached to the primary pipes <br />with plastic ties or other method approved by MANAGER and CERTIFYING ENGINEER. <br />* ** END OF SECTION * ** <br />U <br />Section 02710 Page 3 of 3 September 3, 2008 <br />Piping Revision 1 <br />SAProjects \1125E CCV CQA \I -Tech Specs \02710.r1.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.