My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-21_REVISION - M1980244 (32)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2009-12-21_REVISION - M1980244 (32)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:24 PM
Creation date
12/30/2009 8:54:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
12/21/2009
Doc Name
QA Liner Recert- App. E, Tech Specs. 2
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. Air- Entraining Admixture: ASTM C260. <br />D. Chemical Admixtures: ASTM C494. <br />E. Aggregate: ASTM C33. <br />2.02 MIXES <br />A. Flowable Fill: <br />1. Minimum strength of 300 psi, ASTM C 39, at 28 days after placement. <br />2. Placement slump of between 3- inches and 7- inches. <br />• <br />PART 3: EXECUTION <br />3.01 INSTALLATION <br />A. All flowable fill delivered to the Site shall be placed within ninety (90) minutes from the time of <br />introduction of cement and water into the mix. <br />B. No water shall be added after leaving the batch plant without the approval of CERTIFYING <br />ENGINEER. <br />C. Placement of flowable fill, once started, shall be performed as a continuous operation until the <br />scheduled placement is completed. <br />3.02 PROTECTION AND CURING <br />A. Protect exposed surfaces of flowable fill from premature drying, wash by rain or running water, wind, <br />mechanical injury, and excessively hot or cold temperature. Curing method shall be subject to <br />approval by CERTIFYING ENGINEER. <br />3.03 FIELD QUALITY CONTROL <br />A. All testing (both field and laboratory testing) will be the responsibility of CONTRACTOR. <br />CONTRACTOR shall be responsible for cooperating with CQA Monitor during all testing activities. <br />CONTRACTOR shall provide equipment and labor to assist CQA Monitor in sampling, if requested, <br />and shall also provide access to all areas requiring testing activities. <br />B. Any Work found unsatisfactory or any Work disturbed by subsequent operations before acceptance is <br />granted shall be corrected by CONTRACTOR. <br />* ** END OF SECTION * ** <br />Section 03330 <br />Flowable Fill <br />SAProjectO 125E CCV CQA \I - Tech Specs \03330.r1.doc <br />Page 2 of 2 September 3, 2008 <br />Revision 1 <br />