My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-21_REVISION - M1980244 (32)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2009-12-21_REVISION - M1980244 (32)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:24 PM
Creation date
12/30/2009 8:54:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
12/21/2009
Doc Name
QA Liner Recert- App. E, Tech Specs. 2
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.02 MIXES <br />A. Cemented Rockfill: <br />1. Maximum Aggregate size of 2 -inch. <br />2. 6 percent (by dry weight) cement. <br />3. The Cemented Rockfill will be placed at a water content to be approved by CERTIFYING <br />ENGINEER, corresponding to approximately at optimum water content to wet of optimum <br />water content, as determined by ASTM D698. <br />PART 3: EXECUTION <br />3.01 INSTALLATION <br />A. CONTRACTOR shall prepare the underground working to minimize the amount of sloughing in of <br />material from the sides. <br />B. No water shall be added after leaving the mixing area/batch plant without the approval of <br />MANAGER and CERTIFYING ENGINEER. <br />C. The surface of hardened concrete on which fresh Cemented Rockfill is to be placed shall be rough, <br />and cleaned of all laitance and foreign substances. <br />D. The rock surface within the competent bedrock of the underground working shall be scaled to <br />removed any loose material prior to Cemented Rockfill placement. <br />E. Each 3 foot thick lift of the Cemented Rockfill shall be compacted according to a method <br />specification, approved by the MANAGER and CERTIFYING ENGINEER. <br />3.02 FIELD QUALITY CONTROL <br />A. All concrete testing (both field and laboratory testing) will be the responsibility of CONTRACTOR. <br />CONTRACTOR shall be responsible for cooperating with CQA Monitor during all testing activities. <br />CONTRACTOR shall provide equipment and labor to assist CQA Monitor in sampling, if requested, <br />and shall also provide access to all areas requiring testing activities. <br />B. Any Work found unsatisfactory or any Work disturbed by subsequent operations before acceptance is <br />granted shall be corrected by CONTRACTOR. <br />* ** END OF SECTION * ** <br />Section 03310 <br />Cemented Rockfill <br />Page 2 of 2 <br />September 3, 2008 <br />Revision 1 <br />SAProjects \1125E CCV CQA \I - Tech Specs \03310.r1.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.